Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> NOVEMBER 10, 2021 <br /> Raul with Cape & Islands said that the lot is not located in a ground water protection <br /> district. The westerly property line is the boundary of the ground water protection district. <br /> There will be a ground water drainage system installed, and the second sheet of the site <br /> plan shows the details that were updated as requested at the Plan Review meeting. The <br /> proposal includes the control runoff from the fence. The runoff will be produced by a gravel <br /> surface that is not impervious and will be slopping toward the south. A grass basin will be <br /> installed to provide retention of any water runoff before running under ground to the <br /> subsurface leaching field. There's no septic system required because there is no wastewater <br /> or nitrogen. <br /> Sharon read the Plan Review comments into the record that was recommended for the ZBA <br /> meeting as follows; <br /> -The 48 ft. contour be revised per the Town Engineer's comments. <br /> -The shared driveway shall be paved per the plan. <br /> -The improved park-ing area will be crushed stone. <br /> -The shared driveway will be paved, and that there be a condition of approval to require <br /> proper access to be provided to the property at 43 Bowdoin prior to the sale of the property <br /> to alleviate the shared driveway. <br /> Sharon read Catherine Laurent, DPW Director's comment into the record. "For 43 <br /> Bowdoin Road, it is unclear from the plan what is proposed for drainage. All storm water <br /> runoff shall be contained onsite. In addition, there is not currently drainage infrastructure <br /> at the existing entrance for 37 Bowdoin Road and storm water is running off into the road. <br /> With the proposed shared entrance, drainage should be installed. Finally, overflow parking <br /> (stone) was installed for 37 Bowdoin Road without any permits. This overflow parking <br /> should be eliminated with the addition of the contractor area at 43 Bowdoin Road." <br /> Chris Gallagher said he discussed his concerns and is satisfied. <br /> Raul said that a fence will be installed and will be connected on the West side, and will be <br /> along the side of the boat yard and towards the East connecting with the existing fence of <br /> the cell tower. There will be a driveway installed with a fence to provide privacy for the <br /> yard. The fence will separate the uses for the tower and the yard. <br /> Chairman Furbush wanted to make sure that there is no parking on the street. Mr. <br /> Hagenstein said that there will be enough parking for his business for his equipment and <br /> trucks for the proposed yard. <br /> There were no more comments from the Board. <br /> 13 <br />