Laserfiche WebLink
the Planning Board, a plan showing. topography at a maximum of two <br /> ( <br /> 2) foot contour intervals shall also be required, In addition, <br /> traffic studies, water quality impact reports, environmental <br /> impact reports, fiscal impact reports and similar items may be <br /> required along with those other specific items required _by_.,,_ ., <br /> Sections 9,3 and 9. . <br /> For applications to the Board of Appeals, at least three B . <br /> copies of all application materials shall be submitted, of which <br /> .- <br /> one 1 shall be transmitted to the Design Review Committee* <br /> Where the application involves any land within 100 feet of <br /> wetland, water body or watercourse, a fourth 'copy shall be <br /> submitted for review by the Conservation Commission, Where the <br /> application involves tidal areas or waterways, copies shall also . <br /> be submitted for review by the Shellfish Commission, Harbor- <br /> master and Waterways Committee., The Board of Appeals shall con-'. <br /> s l d r y---c-o en t - o� W le Design �c ew� oiin ,.�. �; .o i r'va . � <br /> Commission, Shellfish Commission'. Harbormaster and other Town .F <br /> officials and boards in making its decision provided that such y <br /> comments are received at or before the required public hearing. <br /> For applications to the Planning Board, at least fifteen (15) <br /> copies of all application materials shall be submitted, unless <br /> additional copies are required elsewhere in this -Law. Inhere <br /> additional copies are not otherwise required by Section 9 to be <br /> submitted by an applicant to Town officials, the Board shall <br /> transmit copies to the Board of Health, Design Review Committee. , <br /> Conservation Commission, Town Planner, Superintendent of Streets, <br /> Building Inspector, Fire Chief, Police Chief and Parks -and <br /> Recreation Director, and where the applioati h involves tidal <br /> areas or waterways, shall also submit copies to the Shellfish <br /> Commissioner, Harbormaster, and Waterways Committee and the <br /> applicant shall supply such additional copies. In addition, for <br /> mixed-use or commercial developments or projects which will <br /> inolve 'a variance request, a copy shall be provided- for review <br /> by the Board of Appeals, The Planning Board shall consider any <br /> comments received From the above-named officials and boards in <br /> making its decision, provided that such comments are received at <br /> or prior to the required public hearing. <br /> Special Permits shall only be issued following a public hearing <br /> held within sixty-five 8 days, but not less than forty-five <br /> (45) days after the filing of an application with the Planning <br /> Board or Board of Appeals at a regular or special meeting, a copy <br /> of which shall forthwith be given to the- Town Clerk by the <br /> applicant after having been signed and dated by-the Board <br /> chairman. _. <br /> Area application for Special Permit may b approved, approved <br /> pp <br /> with conditions, or denied, Conditions may include, but are not. . <br /> limited to,, requirements for traffic or pedestrian improvements . n <br /> .ri <br /> ~1 <br />