Laserfiche WebLink
q <br /> t <br /> Conditions ' . <br /> #3 Mr. Kirrane stated that the f igure of .02 milligrains per <br /> liter should be .2, according to the sewage treatment <br /> engineer. The phosphate treatment would result in effluent <br /> at the plant of ,2. <br /> Mr. Kirrane stated that they are not in agreement with the <br /> security deposit of $20,000 for the monitoring program. <br /> Tony explained that the Board is looking for some other <br /> enforcement mechanism but don' t have another answer at this <br /> time other than the deposit. ; <br /> Mr. Kirrane stated that they will be required by the DEQE to <br /> establish a fund and they can add language to the Condo t <br /> �r <br /> Assoc. documentation to establish an adjunct fund for , <br /> monitoring. They have already provided the Board with the <br /> documentation which show language DEQE requires. <br /> Tony stated that with proper wording and Town Council's <br /> approval it sounds like this suggestion will get the job <br /> done. <br /> They will add to the condition a brief outline of what Mr. <br /> Kirrane has proposed (modification to #3) . <br /> 6 Mr. Kirrane presented a phasing plan to the Board. <br /> Louise asked that they also color code the road to make it <br /> clear of phasing schedule. <br /> Tom would like to see lines used as opposed to color code. <br /> Tony stated they will need a signed copy on record. <br /> They will put specific buildings in the decision to indicate <br /> phasing. The applicant doesn' t need to provide a separate <br /> drawing they can put phasing schedule on the front sheet. <br /> Mr. Kirrane stated that as long as it doesn' t hold up the <br /> process, they will provide it. <br /> Items 7-17 OK <br /> f <br /> #18 It was Mr. Kirrane ' s understanding that there would not <br /> be a condition relating to sprinkler system. The applicant <br /> would do what was required by the fire chief. <br /> I <br /> i <br /> The Board will strike #18 . <br /> 1 <br /> Mr. Kirrane has asked that a note be included to provide for <br /> an extension of the permit if in that time they were unable <br /> to g their et groundwater discharge permit and acted in good <br /> 1 <br /> faith. The language stating this in permit is agreeable <br /> with Mr. Rirrane. ' <br /> Water Quality Monitoring Program <br /> Mr. Kirrane has no problem with it other than the <br /> establishment of a fund, which was addressed in special. <br /> permit. <br /> Tony is concerned about having a boilerplate doc:inme--nt that- <br /> applies <br /> project and may contain a large amount i <br /> to a specific J <br /> ro 'P , <br /> of language that may not apply to that project. <br /> r ' <br /> 7 �. <br />