My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/01/2021 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
12/01/2021 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:27:57 PM
Creation date
1/19/2022 8:37:53 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/01/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
replacement of existing HVAC equipment would be necessary. The study will include a <br /> preliminary cost estimate for each school. Funding will be needed to undertake <br /> design/engineering and then construction, at one or all schools. More information if <br /> available will be presented at the next Committee meeting. <br /> QS Gym Upgrades. The project is the funding for an upgrade to the gym at the <br /> Quashnet School. Work will include replacement of the existing flooring, replacement <br /> of the scoreboard, and replacement of the ceiling hung curtain used to divide the gym <br /> into two separate spaces. Costs are still pending for the flooring. The estimate will be <br /> finalized for the next Committee meeting. <br /> Catherine will forward the final draft of the CIP to the Committee for review prior to the next <br /> meeting. <br /> Next Meeting <br /> January 12, 2022 at 5 pm <br /> Ad'ournment <br /> The meeting adjourned at 6:00 p.m. <br /> Respectfully submitted, <br /> Catherine Laurent, DPW Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.