Laserfiche WebLink
replacement of existing HVAC equipment would be necessary. The study will include a <br /> preliminary cost estimate for each school. Funding will be needed to undertake <br /> design/engineering and then construction, at one or all schools. More information if <br /> available will be presented at the next Committee meeting. <br /> QS Gym Upgrades. The project is the funding for an upgrade to the gym at the <br /> Quashnet School. Work will include replacement of the existing flooring, replacement <br /> of the scoreboard, and replacement of the ceiling hung curtain used to divide the gym <br /> into two separate spaces. Costs are still pending for the flooring. The estimate will be <br /> finalized for the next Committee meeting. <br /> Catherine will forward the final draft of the CIP to the Committee for review prior to the next <br /> meeting. <br /> Next Meeting <br /> January 12, 2022 at 5 pm <br /> Ad'ournment <br /> The meeting adjourned at 6:00 p.m. <br /> Respectfully submitted, <br /> Catherine Laurent, DPW Director <br />