c. Proposal for the Pond Landscape Plan is deleted, as the Pond is not fret approved. <br /> Page 6 d. Parking pads have been extended so that.there is at least 18 feet from the outer edge <br /> of the sldewalK and that the north end of the sidewalk on Longwood Rd shall be connected to the <br /> sidewalk on the north side of Pine Hill Blvd by a proper crosswalk and ramp at the time the <br /> temporary construction entrance is closed and restored. <br /> Page 6 f. Regarding the As Built Plan and Profile of Man Made,Pond. The section is deleted, as <br /> the pond is not yet approved. <br /> Page t g. Architectural plans have been revised''to reflect a new sheet numbering scheme. <br /> Page 7 h. Boulder Retaining Wall clarification to indicate retaining wall only, with other plans for <br /> tennis court, golf clubhouse&parking area and for notation requi'ring hrdroseeding of wall and <br /> base area.. <br /> Page 7 i. Plans for the,.streetlights deleted, as they are r.ot yet approved. <br /> Page 7j.This item is completed. Refers to notes on retaining gall layout plan from John Bologna <br /> of Coastal Engineering Company. A fax was received today from Bologna.indicating corrections <br /> to scale shown on Sheet K 1. <br /> Page 7 k. rye: landscaping plan for base of wall and terraced area-it was approved by the <br /> conservation Commission as of lest Thursday. <br /> Page 7 1. Tennis shelter architectural plan and site plan with landscaping has-been received. <br /> The shelter will be built at the south end of the-tennis courts. <br /> Page 8 i. Concems the temporary construction-access gate and guardhouse opposite Longwood <br /> Road. Once use is discontinued, P p Road from the construction entrance to Old <br /> Barnstable road shall be repairedfrestored by such.means as may be approved by the Board <br /> after review by the consulting Engineer. The access road, gate and guard house-shall'be <br /> removed, the gate replaced with black vinyl chain link fencing similar to the existing perimeter <br /> fencing, and the area shall be restored and landscaped as shown on the plan entitled <br /> °construction Entry Landscape Plan for Southport on the Cape revised 211 EV04 by Hawk Design. <br /> .Also, the north end of the sidewalk on Longwood Road shall be connected to the sidewalk on the <br /> north ide of Pine Hill Blvd. By a proper crosswalk and ramp at the time said temporary <br /> construction access is dosed and restored. <br /> Page 9 n.Three buildings are being changed as far as their unit nfi urrations. Two near the <br /> retaining wall will change from-duplex to quad. Previously approved quad building 198 will b <br /> changed to a duplex. <br /> Page 9 o. Previously constructed manmade pond is not.yet approved. <br /> Page 9 p. Approval of f edi- ock retaining wall is in process' quad buildings will not be built until <br /> a building permit for the gall is issued.and its construction is completed to the satisfaction of the <br /> Building Inspector and any necessary approvals are received from,the conservation Commission. <br /> The terrace at base of the s ll is to be landscaped per the'Landscaping Plan for Base of Wall <br /> and Terraced Area"dated 2118/04, subject to any changes required by conservation Commision. <br /> Page 9 s. Approval of a revised Ioca on of a tennis shelter, per the architectural plan entitled <br /> LLTennis Shelter, Southport, Mashpee Cape cod" referenced above under approved plans. <br /> Page 9 u.Approval doesnot include the man-made pond located between Floods Edge Lane, <br /> Ironwood Path and Beacon court or the-street light fixtures constructed and proposed unless <br /> conditions described under III CONDITIONS have been ,net. <br /> Page 10 1.Approval is conditloned on the performance of perc tests in the area of all proposed <br /> storm drainage perc basins as soon as weather and ground conditions permit. Leaching pit sizes <br /> shall be adjusted if required based on perc test results and soil types encountered. Test results <br /> must be submitted to the Planning Board arid'its consulting Engineer for approval prior to <br /> installation ofo any storm drainage structures. <br /> Page 10 2.specifies a whole series of inspections. Approval is conditioned on inspection and <br /> approval of all new roadway, parking and associated drainage facilities by the Planning . <br /> Board/Consuiting Engineer on dates noted_ Inspections by the consulting Engineer are required <br /> prior to covering any drainage structures, upon installation of gravel road and parking area base, <br /> upon completion of paving binder course, and paving finish,course, and as a final inspection after <br /> completion of grassed shoulders, street signage, sidewalks, crosswalks and associated utilities. <br /> Inspection by the consulting Engineer will also be required prior to covering any leaching <br /> structures and other subsurface elements related,to the man-made pond, upon completion of <br /> 3 <br />