My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/02/2005 PLANNING BOARD Minutes
>
11/02/2005 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 5:00:59 PM
Creation date
1/19/2022 3:18:45 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
11/02/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Show annotations
View images
View plain text
Mr. Rowley -commented that one of the bounds has been <br /> damaged (probably during construction) . There are some <br /> areas around the cu' l-de-sac where there is very little <br /> shoulder around each side of the pavement . <br /> Dennis Balarini suggested the Board withhold <br /> , 000 . o for the cost of loam and seed, and release the <br /> balance of monies being held. <br /> OTIOR: Dennis Bal arini made a lotion to withhold <br /> the amount of Five Thousand , 000. 00 Dollars as security <br /> -for loam and seed at Nicoletta' s Gray; which Motion was duly <br /> seconded by Lee Gurney and so voted unanimously. <br /> Planning Boarrd Members proceeded to sign the Record of <br /> Performance Guarantee. <br /> Performance Guarantee <br /> Christopher John-son - Christopher Lane <br /> Release of 'Performance Guarantee <br /> The Town Planner reported that Applicant ha-s requested <br /> a continuance to the next meeting in order to complete work <br /> that needs to be done. <br /> References were made to- the Consulting Engineer' <br /> comment letter dated November 2, 2005, regarding his <br /> inspection of this property. <br /> Special Permits <br /> [ indchime Point - off Great Deck road south <br /> Discussion of l evegetati n of Construction Drive and <br /> Review of Phase III and the Status of the overall Project <br /> The Chairman called this matter to order and <br /> recognized Torn Quinn, Windchime Point . <br /> r. Quinn reported that the revegetation of the <br /> construction entrance area has been completed. The post <br /> office building foundation has been completed. All of the <br /> drainage and dense crude has- been completed. The building <br /> permit has been issued and Applicant is ready to begin <br /> above ground construction of the post office ]wilding. <br /> Mr. Quinn stated the drainage and sewerage items have <br /> been repaired and tees have been installed. There has been <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).