Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> Donald S. Bellis and Susan E. Dacey-Bellis <br /> 150 Waterway(Map 105 Parcel 237) <br /> Mashpee, MA 02649 <br /> FINDING-2014-11 <br /> The current dwelling was constiucted back in the late 1960's with"texturized 111" <br /> sheathing and was consistent with other homes in the neighborhood,but is out of character <br /> with current homes. The homeowners would like to install an elevator to accommodate <br /> handicapped family members and is not practical to retrofit the existing dwelling with the <br /> design of the current home. <br /> The existing structure is non-conforming with one of the side yard setbacks at 10.2 <br /> feet and the requirement is 15 feet. The front yard setback is 30.7 feet, and 40 feet is <br /> required. The distance from the wetland is 41 feet and 50 feet is required. There is also an <br /> accessory dock, pier and float on the lot. <br /> The new home design depicts a 2-story, 3-bedroom dwelling. In addition,there will <br /> be a new Title 5 septic system incorporated into the project. The proposed structure will <br /> have a footprint of 2,995 square feet which represents a 19.96% lot coverage; compliant <br /> with the required 20% lot coverage. The building as proposed will sit back approximately <br /> 26.3 feet and will bring it closer to Waterway,but will become compliant on the sidelines, <br /> where it was not compliant before. That one side yard will be 22.7 feet and 17 feet on the <br /> other side. In addition, it will be compliant with the 50 foot setback requirement from the <br /> wetlands, and will improve to 53 feet from the wetlands. <br /> Mr. Kirrane stated the Board is familiar with the bylaw which does allow for <br /> alteration changes, extensions to pre-existing non-conforming structures, as it relates to <br /> this raze and rebuild project. The design is still non-compliant in the front yard, which <br /> made this obligation to submit an application to the Board for a special permit relief. The <br /> proposed is not substantially more detrimental to the neighborhood than what currently <br /> exists, and has adequate setbacks and parking on the site to service the needs of the <br /> occupants of the proposed structure. The project was approved by both Conservation and <br /> Board of Health Departments. <br /> Mr. Furbush asked if the house is being lifted. Mr. Kirrane stated the elevation of <br /> the garage is being lifted in order to accommodate a handicapped family member. The <br /> height is 35 feet. <br /> Mr. Tim Luff stated the design of the home accommodates the new flood maps. <br /> The new basement and all living space will behind the new FEMA line, and will be at an <br /> appropriate height. Also, the structural engineer will design the deck to meet the velocity <br /> zone requirements. <br /> Mr. Furbush read the comments from Conservation into the record, "The <br /> Conservation Commission unanimously approved this application at the February 27,2014 <br /> hearings. The applicants requested a waiver from the regulatory requirements of the Ch. <br /> 172 Wetland bylaw to allow for some encroachment into the 50' setback from the wetland <br /> edge in the interest of accommodating a handicap access ramp." <br /> 2 <br />