Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />MARCH 12, 2014 <br />• MINUTES <br />The dwelling will comply with the 40 foot front yard setback requirement depicting 43.5 <br />feet from Popponesset Island Road. Although it does not comply with the 50 foot wetland <br />setback requirement, it will improve by 2 feet with the proposed new pool at 23 feet <br />reducing the overall lot coverage by more than 1.5%. <br />This proposal has been approved by Conservation, and the five bedroom septic system was <br />approved by Board of Health. Mr. Kirrane stated the substantial increase in value, and the <br />overall improvement of the structure will conform to current day zoning requirements. It <br />will be a substantial upgrade to the property, and will not result in a substantial detriment <br />to the neighborhood. There is also plenty of parking on site, and other than the setback to <br />the seawall, the project complies with all other setback criteria. <br />Mr. Furbush asked if most of the dwelling is on flood zone A13 elevation 11. Tim Luff <br />stated the flood line goes along the seawall and in front across the two garages, and will <br />have flood vents, but the elevation of the mud room is above elevation 11 and will have a <br />slab. It was designed so the basement is not in the flood zone. <br />Mr. Furbush asked if there will be a problem with the bottom of the stairs showing 13.9 <br />feet along Lot 49. Mr. Kirrane stated there is no issue becausethe stairs do not have to <br />comply with the setback criteria. Tim Luff stated he spoke to Tom Bunker, Engineer, BSS <br />Design and the landscape architect "massaged" the grades and elevations by eliminating <br />is <br />the step and tweaked the platform and will redesign to comply with the 15 feet. <br />Mr. Goldstein read a letter dated March 6, 2014, submitted by Catanzaro and Allen, <br />Attorneys, into the record stating they represent the abutters at 140 Popponesset Island <br />Road, and objects to the project. Mr. Furbush read an email dated March 12, 2014, from <br />Gerry Carroll summarizing he objects to the project. <br />• <br />Mr. Furbush read comments from Conservation into the record; "This project was <br />unanimously approved by the Concom on February 27, 2014, no issues", and comments <br />from Board of Health into the record; "Title 5 design plan as approved on 3/7/14 for five <br />bedrooms, no denite required." <br />Mr. Michael Price, Trustee to the 128 Popponesset Island Road abutting to the left of the <br />Derenzo property stated he has no objections to the project, however he is concerned with <br />the noise from the pumps and filters for the pool. He wants to make sure the mechanical <br />building will be equipped with sound proofing. <br />5 <br />