Laserfiche WebLink
.7 <br />MASHPEE ZONING BOARD OF APPEALS <br />NOVEMBER 12, 2014 <br />MINUTES <br />Mr. Blaisdell, approved, yes, Mr. Reiffarth, seconded, yes, Mr. Furbush, yes, Mr. Jodka, <br />yes, and Mr. Goldstein, yes. All were in favor. <br />Attorney, Kevin Kirrane, represented Lewis Seminara who is proposing to construct a <br />9,980 square foot building at 68 Echo Road and to utilize this building for special permit <br />uses as noted in the application. It's a 60,000 square foot lot with 200 feet of frontage along <br />Echo Road, is approximately 165 feet long and 60 feet wide. The plan depicts a building <br />design up to eight (8) individual bays that are 1,200 square feet each and are typical <br />contractor bays. This building will be built to conform to the appropriate setbacks as <br />indicated in 58 Echo Road. <br />Mr. Furbush stated the same comments apply for the record as indicated in 58 Echo Road <br />by the various Boards at the Design/Review meeting dated October 21, 2014. The Board <br />of Health application for December 4, 2014, and the Building Commissioner; "68 Echo <br />Road will need to file Controlled Construction Application," and an updated landscape <br />plan needs to be re -submitted. <br />Mr. Ojala will update the site plan showing updated plantings and will introduce some fill <br />to the landscape grades. <br />• There was a question regarding the comments from the Fire Department of the "fire lane". <br />Mr. Ojala stated he will speak with the fire inspector regarding this comment. <br />Charlie Rowley said the same questions apply for 68 Echo Road as applied with 58 Echo <br />Road. <br />Mr. Blaisdell made motion to approve Louis Seminar's request for a Special Permit under <br />§ 174-24, and § 174-25 (Table of Use Regulations), and § 174-41 (Parking Lot Design) to <br />allow for construction of an industrial warehouse building on property located in an I-1 <br />Zoning District at 68 Echo Road, (Map 19 Parcel 14) Mashpee, MA. This approval is <br />conditioned upon Board of Health approval meeting on December 4, 2014, and conditioned <br />upon receiving a letter from Charlie Rowley, assuring the Board that all the remarks listed <br />are completed and approved, clarification from Fire Department regarding the "fire lane" <br />comment, and revising the Landscape Plans. Referencing a Site Plan titled; #68 Echo Road, <br />Mashpee, MA, prepared for Louis Seminara, dated September 26, 2014, revised <br />11/11/2014 with Town Comments, prepared by Down Cape Engineering, Inc., 939 Main <br />St. (Rte. 6A), Yarmouthport, MA. Stamped by Daniel A. Ojala No. 40980. <br />Mr. Blaisdell, approved, yes, Mr. Reiffarth, seconded, yes, Mr. Furbush, yes, Mr. Jodka, <br />yes, and Mr. Goldstein, yes. All were in favor. <br />0 <br />