My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/2014 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2010-2019
>
2014
>
11/12/2014 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 1:21:09 PM
Creation date
1/20/2022 1:20:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br />NOVEMBER 12, 2014 <br />• MINUTES <br />Dan mentioned that at Design/Review and reiterated by Charlie Rowley were a few minor <br />issues such as installing solid catch basins similar to other sites that were installed in <br />Mashpee. There will be four solid bays and in case of a petro -chemical spill will flow into <br />a solid contained base that can be easily pumped out. <br />Mr. Furbush noted that 58 and 68 Echo Road are scheduled with the Board of Health on <br />December 4, 2014. <br />Mr. Furbush read an email dated November 12, 2014 from Charlie Rowley, to Dan Ojala <br />into the record; "The landscape plans are on the old format for drainage. I think they should <br />be updated to reflect the changes you made." Mr. Ojala stated he will update the plans. <br />Mr. Furbush read a comment dated November 10, 2014 from Mike Mendoza, Building <br />Commissioner into the record; "Will need to file control construction"; (definition of <br />control construction is Building Code Requirement.) <br />Mr. Furbush read comments from all departments at Design/Review meeting dated <br />October 21, 2014. <br />Mr. Rowley stated he needs the drainage calculations and will need to review them. He <br />suggested a 100 -year storm drainage calculation to make sure there is no off-site impact. <br />He would like to see the ramps and steps in front of the doors to be concrete instead of <br />asphalt to avoid water running underneath the doors. It's a client preference. He also <br />wanted confirmation of the number of parking spaces at #58 Echo Road. The 6" water line <br />that runs across the property boundary and the access way between the two lots. As long <br />as both properties are owned by the applicants, there should be no problem. There should <br />be an indication on the plans that there is an easement for the water main, and also for the <br />joint access across the property boundaries. If there's a change in ownership there could be <br />an issue. He will provide a letter to the Board with all his recommendations. <br />Attorney Kirrane stated there will be a written easement document between the two lots, <br />and will be addressed. <br />Mr. Blaisdell made a motion to approve Anne Seminara's request for a Special Permit <br />under § 174-24, and § 174-25 (Table of Use Regulations), and § 174-41 (Parking Lot <br />Design) to allow for construction of an industrial warehouse building on property located <br />in an I-1 Zoning District at 58 Echo Road, (Map 19 Parcel 13) Mashpee, MA. This approval <br />is conditioned upon Board of Health approval for 58 Echo Road, meeting on December 4, <br />2014 and conditioned upon receiving a letter from Charlie Rowley, assuring the Board that <br />all his remarks listed are completed and approved, clarification from Fire Department <br />regarding the "fire lane" comment, and revising the Landscape Plans. Referencing a Site <br />Plan titled; 958 Echo Road, Mashpee, MA, prepared for Anne Seminara, dated Septemb6r <br />26, 2014, revised 11/11/2014 with Town Comments, prepared by Down Cape Engineering, <br />• Inc., 939 Main St. (Rte. 6A), Yarmouthport, MA. Stamped by Daniel A. Ojala No. 40980. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.