MASHPEE ZONING BOARD OF APPEALS <br />DECEMBER 10, 2014 <br />MINUTES <br />. Mr. Forbush stated that Charlie Rowley's letter dated December 10, 2014, titled Site Plan <br />Review for Cotuit Solar Trinity Place be included into the record. <br />Mr. Furbush read an email from Charlie Rowley, dated December 10, 2014 "Mary Ann <br />and Joel: The Planning Board approved the construction of pavement that is next to the <br />proposed bam on the Cotuit Solar property. There is also a turnaround easement for that <br />purpose. So If vehicles need to turn around they can enter onto the easement for turning <br />purposes without encroaching onto private property. It also shows up on the site plan for <br />the new barn that is before the ZBA and is labeled as such. Between the pavement of Trinity <br />Place, and what is on the site itself there should be plenty of room for even the tower to get <br />turned around. It may take some backing and filling but it would have to do that even if it <br />was just a "T" at the end of the road. Hope this helps." <br />This approval is conditioned on the following conditions: <br />• Sampson's Mill Road is not to be used as access for any construction vehicles or <br />private vehicles. <br />• The gate, with an approved lock — by the Fire and Police Department must be <br />installed within thirty days from the date of this approval, and will be 97 feet from <br />the southernmost point of the lot as shown on the plan, dated December 10, 2014 <br />• • Hours of operation are to be in compliance with the Town of Mashpee established <br />hours of operation for construction and the operation of a business. <br />• Lighting is to remain on site. No lighting shall be on the side of the storage building <br />which faces the home at 28 Sampson's Mill Road. <br />• The parking area, facing the residential district must, have a buffer as outlined under <br />§ 174-41 K and or L prior to the issuance of an Occupancy Permit. <br />• Apply for all necessary building permits within sixty (60) days after the approval. <br />• As stated by the Town Planner (email dated September 19, 2014), no building <br />permits can be issued on the property until a "Release of Covenant" has been signed <br />by the Planning Board and recorded at the Registry of Deeds. <br />• . That the Storm water Management Report prepared by Linda Pinto, PE, Oceanside <br />Septic, Inc., Engineering Division dated May 14, 2014, revised December 1, 2014 <br />to be incorporated in its entirety. <br />• The lights are to be as noted on the accompanying specification sheet. In the case <br />of isolated post mounted lights, the posts are to be a maximum of 10 feet in length. <br />• That the applicant and/or contractor responsible for all site work make appropriate <br />provisions for timely inspections of construction with at least 24 hours' notice for <br />at least the following: <br />0 <br />