Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br />DECEMBER 10, 2014 <br />MINUTES <br />• <br />a. Establishment of limits of work and erosion control measures in place. <br />b. Stockpiling of topsoil or other materials to be used on the site. <br />c. Preparation of drainage areas, structures and pipe prior to backfilling. <br />d. Placement of base material prior to paving or stone for surfacing. <br />e. Fine grading and placement of bituminous asphalt for parking areas. <br />f. Landscaping, final grading and loam and seed and area lighting. <br />g. Final Inspection. <br />Attorney Kirrane asked the Board that the plantings around the parking area does not <br />require a full filing with the Conservation Commission. The intent would be to provide <br />plantings within the 100 foot buffer zone. <br />Mr. Bonvie stated the plantings would be required unless Conservation Commission <br />requires a submission for a Notice of Intent. <br />Mr. Furbush stated no building construction and/or vehicles allowed to use Savannah's <br />Path from Sampson's Mill Road. The only access allowed is for reconstruction of <br />Savannah's Path. <br />• Mr. Bonvie made a motion to issue a Variance under 174-31 and 174-41 of the Zoning <br />Bylaws for setback relief requirements and the non -requirements to not pave eight (8) <br />parking spaces of a residential structure located in a C-2 zone at 36 Savannas Path, (Map <br />62 Parcel 68B), Mashpee, MA. Also making this motion would require the applicant or <br />any future owners of the property who chooses to pave any of the eight (8) parking spaces, <br />that a third drainage pit be required and an engineer would be required to review the <br />location of that pit. Any change in use of the existing office and proposed warehouse would <br />require applying to the Zoning Board of Appeals for review and approval. Referencing a <br />set of site plans, (two sheets) prepared by CSN Engineering, PO Box 201, Brewster, MA, <br />stamped by Linda J. Pinto, Revised 12/10/2014: Revised Gravel Parking, Added Spot <br />Grades and Catch Basins, Removed Air Intake Pipe, Revised Barn Elevation, Lighting <br />Note. Prepared for Conrad Geyser, Route 28, Cotuit, MA, Also referencing the "Narrative" <br />prepared by Cotuit Solar, General project description:, Road Layout and Drainage Plans <br />Approved by Planning Board". (Removed "Proposed Warehouse Structure"). <br />Bill Blaisdell, seconded, yes, Mr. Furbush, yes, Mr. Bonvie, yes, Mr. Reiffarth, yes, Mr. <br />Goldstein, yes, and Mr. DeBarros, yes. All were in favor. <br />Mr. Bonvie made a motion to issue a Special Permit under §174-24, §174-25 D (1) and <br />§174-41F for construction of a solar warehouse and meet adequate parking requirements <br />located in a C2 Zone at 36 Savannas Path, (Map 62 Parcel 68B), Mashpee, MA. <br />Adding to the motion the specific reference to the Variance of the eight (8) parking spaces, <br />• and the specific use to be as small office space and warehouse only. <br />