My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/02/2002 PLANNING BOARD Minutes
>
01/02/2002 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2024 3:01:45 PM
Creation date
1/25/2022 2:02:41 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
01/02/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Show annotations
View images
View plain text
MashyP ee PlanningBoard <br /> January 2, 2002 <br /> Minutes <br /> • 'n • chair, �i1 Ter e�rrl Cane, Dennis Balarini, <br /> Members Present: Martine 1f �� r� r � <br /> Steve Dolan • <br /> Also Present. Torn Fudala, Town Planners Charles Rowley; Consulting Engineers Nella <br /> Stevens; Board Secretary <br /> IIJIain fit. Ito. 1 Assessors �a 1 loci 11 <br /> leant. Anolnor �tora a of Mash e <br /> PP Commission I approval Nov. 1. , 2001 <br /> Request: Approval o Special errr��t, Cape Cod <br /> • fans. He explained that the plans include bath <br /> Kevin l�i�rane displayed previously approved � . <br /> • went into lengthy dtail about the buildings, usage, site, <br /> C-2 and Industrial hones. l�••# a ]� . . <br /> about mitigating measures required y the <br /> landscaping, hse � usage, etc. He talked * + • . <br /> � -nitrification stern. !fie went into some <br /> d Commission, which involved the use of de • <br /> Cape � hod commission had <br /> he comprehensive landscape plan, as the Cape <br /> further detail about t p he waterquality <br /> . buildings from fete. 130. Regarding t <br /> some concerns about �s.�l��l.�ty f the <br /> report, he said that the <br /> Board could review it and will find it suitable. <br /> ` and Tin sera sync. Denniswanted to know how <br /> Available for questions were Donald Priestly y . . <br /> ' - the storage facility for non-renters. <br /> buildings were. He had concerns about access t + i . <br /> high the bu �t�onll he described the <br /> • that there would b separate entrances. Additionally,11�llr. Priestly surd � river. Merin further <br /> • in lace. Dennis questioned the impact on the <br /> security system that will be � � n if the dire <br /> • . . tern as it relates o the river. Charlie wanted t <br /> explained the de-nitrification id have some <br /> ' plans. Kevin said that the Fire Department d <br /> Department had seen the re <br /> concerns about certain <br /> arl in- g space that may obstruct fire trucks. <br /> ' r the water u �li report are needed. Kevin <br /> said that actual calculations for t <br /> Torn Fudala sa include data. Martine requested <br /> would conform. He agreed to copy and insisted that everythingon the subdi�rision plan <br /> • Cod Corr mission. Charlie had further question <br /> figures from the gaped question about roof <br /> t the were abandoning that plan. Tom had to which l�Ce �n responded the <br /> drainage. Kevin said that it was tied into parking trot drainage. <br /> layout; h wondered about clearing it <br /> •. concerns about Fite. 1 o and the g ft. y <br /> Charlie had some ` t a o ft. Sri strip could fit. <br /> es it as a safe condition. Kevin said the <br /> u a bit because h s � further <br /> • for grater drainage. Beverly asked for <br /> There was some further discussion about , * • sin <br /> • ` • ■ specifically, what type of system it was. <br /> • • ■ de-nitrification system, sp � � <br /> clarification regarding the f the project. r. <br /> said that had not yet been determined. Beverlyinquired about the time-tableP 11 <br /> Priestly said <br /> bout sic or seven months for Building 1 . <br /> • following condition: compliance with <br /> Dennisto rove Special Permit With the f o g • <br /> Motion by � modified; c information � four <br /> • • mission; b that drainage b <br /> � ions of a �ape��od tom t <br /> decisions reported. seconded by Beverly; <br /> quality report issues need to be satisfactorily p <br /> more q � <br /> unanimous. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).