My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/04/1998 PLANNING BOARD Minutes
>
03/04/1998 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2022 5:02:08 PM
Creation date
1/27/2022 1:29:42 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
03/04/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t . <br /> z Conservation Review, and Department of Public' c works. <br /> There was general discussion re ardin costs includin■ g g g , <br /> }:SR salary, benefits, secretarial, and office equipment. <br /> ;1l The Town Planner stated positions have been created for an 4 <br /> Engineer, Assistant, and secretary. Although, only the position <br /> s.: of Engineer is being proposed, 11;0 <br /> il <br /> The Town Planner further stated Thirty Thousand ($30, 000 . 00) <br /> Dollars has been to renovate proposed attic space in the DPW <br /> Garage for office space, <br /> John Kuchinski inquired if a salary amount has been proposed ';kto' <br /> for this position; to which the Town Planner answered, Fifty-Two <br /> �k <br /> Thousand <br /> �$52. ❑❑❑ . ❑❑} Dollars as starting salary. ,, • <br /> Dennis Bal zarini stated he feels it would be cost effective <br /> for the Town to continue with the present arrangement of a <br /> Consulting Engineer for the Planning Board. 46 <br /> wLs There was discussion,regarding the consulting budget for the ,, <br /> = Town being One Hundred Thirty Thousand 13 `; <br /> y �$ ❑, ❑❑❑ . ❑❑} Dollars t� <br /> which includes Legal and Engineering <br /> e e r i ng costs �i. <br /> 1} 1 <br /> Chance Reichel suggested submission of a written analysis <br /> of actual s would be helpful. k <br /> r r <br /> John Kuchinski inquired as to the amount of money spent on <br /> consulting fees per year b each Department., The Town P1 � <br /> y p annex <br /> xs` stated that when consultants are hired by the Board of Appeals it � <br /> IS done so by special legislation, whereby the Applicant is <br /> ibl <br /> re s ons pay <br /> responsible t o <br /> the fees. <br /> r <br /> rTrn r l <br /> T 43 yl 1 <br /> The Chairman determined. Planning Board dedication to be the ' A III <br /> a primary consideration of the Board, <br /> •j: <br /> There was discussion as to the type of inspections currently <br /> L J'. <br /> being made by the Consulting Engineer (gravel, drainage, and <br /> finished paving) <br /> ,.I x <br /> The Chairman noted the following considerations: potential <br /> advantages to the Town; costs; Planning Board service; and � <br /> competence of the Engineer. <br /> The Town Planner stressed Mr. Rowley' s experience working >d , p <br /> for the Town (2❑--gears) . He informed the Board that the budget <br /> would allow for a one (1) month transition period between <br /> emp 1 oye e s. rr r, 01 <br /> The Town Planner stated the Finance Commit tee has requested <br /> o z receipt of a Memo within the week relative to this matter, in <br /> •��:<.� addition to receipt of a budget for the Planning Department. <br /> r2- ' 'i <br /> �.Fti(zr �1 I <br /> i ! <br />
The URL can be used to link to this page
Your browser does not support the video tag.