My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/12/2022 ZONING BOARD OF APPEALS Minutes
>
01/12/2022 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:01:27 PM
Creation date
1/28/2022 9:15:17 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
01/12/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> JANUARY 12,2022 <br /> 30 Sand Dollar Lane: Owners,Jody and Alexandra Simes request a Special Permit under <br /> §174-17.1 of the Zoning Bylaws to raze and replace a three bedroom single family <br /> residence with a new three bedroom residence on property located in an R-3 Zoning <br /> District, Map 105 Parcel 84, Mashpee, MA. <br /> Sitting on this hearing were Chairman Furbush, Mr. Blaisdell, Mr. Ganzenmuller, Mr. <br /> Reidy, and Mr. Caggiano. <br /> Attorney Kevin Kirrane represented the homeowners for their raze and replace project <br /> located on a cul-de-sac in the Summersea section of New Seabury.Also present was Kevin <br /> Dufane who designed the building, and Andrew Garaway who designed the landscaping <br /> plan. Mr. Kirrane provided the Board with site plans and his written presentation. The lot <br /> consists of 10,900 sq. ft. and backs up along Ockway Bay as noted on the existing <br /> conditions plan, and constitutes a non-conforming lot. The lot has been approved for a 3- <br /> bedroom single story structure with an attached accessory garage. The existing structure <br /> and garage are non-conforming in several respects including the side yard setback on the <br /> southwest side of the lot and the wetland resource areas. The lower level of the dwelling is <br /> below the flood elevations. The lot also exceeds the current lot coverage criteria at 23.43% <br /> and does meet the current front and side yard setback criteria. <br /> The proposed plan of the structure improves some of the non-conformities that currently <br /> exist on the site. The non-conformity on the westerly side of the property remains from 8.4 <br /> ft. to 9.5 ft. from the marsh. The new structure will be further away from the wetland <br /> resource areas. In addition, the proposed lot coverage is somewhat reduced from 23.43% <br /> to 23.35%.The replacement of the non-conforming garage improves the front yard setback; <br /> from 34.5 ft. to 34.1 ft., and the side yard will improve from 10.8 ft. to 11 ft. and 11.2 ft. <br /> as compared to 10.9 ft. The proposed garage is attached to the existing proposed non- <br /> conforming structure. <br /> The proposed new construction of the dwelling will be raised above the flood plain <br /> elevation. The proposed new structure will become a two-story dwelling. This project was <br /> approved by the Conservation Commission. There was some concerns raised by the <br /> abutting neighbor regarding certain plantings, but a new plan was designed as requested by <br /> the Conservation Commission. There will be a new Title 5 septic system installed to keep <br /> up with current day code requirements. The majority of the non-conformities have <br /> improved, and concluding Mr. Kirrane suggested to the Board that the current 50 year old <br /> structure in the flood zone, and replacing it with a new code compliant structure out of the <br /> flood zone, is not sustainably more detrimental than what currently exists. He noted that a <br /> certificate was submitted from the New Seabury ARC who approved the proposed <br /> structure. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.