Laserfiche WebLink
Mashpee Zoning Board of Appeals <br />Minutes <br />July 28, 2010 <br />•Mr. Dorsey said that the Petitioner should submit a certified plan showing the exact dimension of <br />the pool, the exact location of the pool equipment and the exact location of the `portable' spa. <br />Mr. Nelson said that the plans should have been available and submitted at the time that the Petition <br />was filed with the Town Clerk. The ZBA office requested the plans on numerous occasions from <br />Mr. Buckley. When Mr. and Mrs. Peltzman came to the ZBA office to review the plans, none were <br />available. Mr. Bonvie asked if the Peltzmans had seen the certified plan. The ZBA office had to <br />call One Pointe Curators again requesting the plan, which was faxed. Mr. Bonvie said that the <br />abutters did not see the certified plan. <br />Mr. Buckley said that he submitted conceptual and landscape plans prior to the meeting. Mr. <br />Reiffarth repeated that the plan must show the exact location of the pool equipment. He expressed <br />concern that the equipment could be placed right next to the pool. Mr. Buckley said that the <br />Decision could be rendered with that stipulation. Mr. Reiffarth reiterated that the plan should show <br />the exact location of the equipment. Mr. Nelson said that the plan should show the exact size of the <br />pool. He asked if the Petitioner had received Board of Health and Conservation Commission <br />approval. Mr. Buckley said that the proposal does not fall within Conservation Commission <br />jurisdiction. <br />Mr. Blaisdell read the memo from Building Commissioner Richard Stevens, which reads: <br />"Olavo Macedo/16 Driftwood Circle: This is a Cluster subdivision and setbacks are 30' <br />from road 15' sides and 20' from rear with 30% lot coverage. The lot is level however there <br />are septic restrictions which could favor granting relief" <br />The Board allowed Mr. Buckley an opportunity to present some options and tried to work with the <br />inconsistent plans. Mr. Bonvie restated that he feels the Board should take the Peltzman's <br />concerns into consideration and that the plan should be more detailed. Mr. Nelson said that one of <br />the plans shows the location of.the deck, which will be 6 feet from the property line. Mr. Nelson <br />said that another plan shows a landscaping plan with shrubbery to be planted, which details do not <br />appear on the certified plan. <br />Mr. Buckley said that the existing fence is five feet with a one -foot lattice top. <br />Mr. Blaisdell said that he was confused because one of the plans shows a deck, but the certified plan <br />does not include the deck. Mr. Buckley said that the word `deck' was handwritten on the plan, but <br />is actually a patio, a coping. He said that this plan is a `conceptual plan'. Several plans are now on <br />file, but are confusing because of the discrepancy between them. <br />Mr. Buckley assured the Board that the pool equipment and the spa will be located next to the <br />garage and not next to the abutter's property line. <br />The Building Department issued a request to the ZBA office concerning ZBA Decisions. Once a <br />favorable Decision has been rendered by the Board, the Building Department would like a copy of <br />the Decision citing the approved plans. The plans should be signed by the Board and should be on <br />•file in the Building Department when Applicants file for building permits. This will allow the <br />Building Department to ensure that construction is done according to an exact plan that has the <br />ZBA's approval. <br />4 <br />