My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/09/2009 ZONING BOARD OF APPEALS Minutes
>
09/09/2009 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 5:10:26 PM
Creation date
1/28/2022 4:16:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
09/09/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Zoning <br /> Board of Appeals Steven and Karen Petrucci <br /> 2 SP-09-28 <br /> The Mashpee Zoning Board of Appeals issues this Decision pursuant to the <br /> provisions of Massachusetts General Laws Chapter 40A Section 9 and the Town of <br /> Mashpee Zoning By-laws. <br /> SPECIAL PERMIT CRITERIA <br /> Section 174-17 and 174-20 of the Mashpee Zoning By-laws and Massachusetts General <br /> Laws Chapter 40A, Chapter 6, require a"Findings of Fact"that the razing, extension, <br /> alteration or removal shall not be substantially more detrimental to the neighborhood than <br /> the existing non-conforming use. <br /> GENERAL FINDINGS <br /> 1. that the subject property is located at 92 Waterway and contains 9,400 square <br /> feet. <br /> SPECIFIC FINDINGS <br /> The Board determined that: <br /> 1. the proposal will not be more detrimental to the neighborhood. <br /> 2. Conservation Commission has approved this project. <br /> In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br /> Petitioner suet the criteria necessary for the granting of a Special Permit for Findings of <br /> Fact. Upon motion duly made and seconded, the Zoning Board of Appeals voted <br /> unanimously on September 9, 2009 to grant a Special Permit/Findings of Fact to allow <br /> for altering/changing of the pre-existing non-conforming structure. This has been <br /> granted conditioned on plans from Cape & Islands Engineering, dated June 11, 2009, <br /> revised September 8, 2009. <br />
The URL can be used to link to this page
Your browser does not support the video tag.