My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/13/2008 ZONING BOARD OF APPEALS Minutes
>
08/13/2008 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 5:02:49 PM
Creation date
2/1/2022 2:39:56 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
08/13/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Zoning <br /> Board of Appeals Frank Silva(Foley Auto Repair) <br /> 2 SP-08-37 <br /> order to open and operate an auto repair shop. Applicant came to the Board <br /> in August requested a Special Permit to operate an auto body repair shop. <br /> Upon some investigating, it was determined that there were a number of <br /> things required in the original Special Permit that was issued to Mr. Silva in <br /> 2004 that were not completed. Some of the changes were attributed to Mr. <br /> Beaulieu's request to run an auto body shop, however there are several other <br /> issues that were the responsibility of the owner of the property, Mr. Silva. <br /> He has filed a Modification of the Original Special Permit (SP-08-48). <br /> Along with this Special Permit filed by Mr. Beaulieu (SP-0837) Mr. Silva <br /> has agreed to complete all requirements set forth by the ZBA by December <br /> 31, 2009. Ms. Thompson informs the Board that the items below have been <br /> addressed as follows: <br /> 1) Adequacy of parking: the site plan review determined that 26 <br /> parking spaces are adequate for the existing uses and the proposed <br /> use for automotive repair. Two handicapped spots (one van <br /> accessible) are provided in accordance with ADA requirements. <br /> 2) Sprinkler System: a letter from James McHuth, JB Engineering <br /> was submitted to the Fire Department and the ZBA which states <br /> that the sprinkler system was installed in the building for the <br /> contractor use is also adequate for the automotive repair shop. <br /> 3) Firewall Separation—Inspected by Building Commissioner, <br /> Richard Stevens. <br /> 4) Waste Oil Container: Mr. Beaulieu contacted the Fire Department <br /> and has applied for the permit required by the Fire Department. <br /> Mr. Beaulieu will comply with Fire Department regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.