My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/08/2008 ZONING BOARD OF APPEALS Minutes
>
10/08/2008 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 5:00:22 PM
Creation date
2/1/2022 3:56:37 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
10/08/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_6) <br />MASHPEE ZONING BOARD OF APPEALS <br />PETITION FOR A VARIANCE <br />Under Massachusetts General Laws Chapter 40A § 10 <br />and Town of Mashpee Zoning By-laws <br />To: Mashpee Zoning Board of Appeals Date: September 16, 2008 <br />The undersigned Petitions the Mashpee Zoning Board of Appeals to vary, in the manner <br />and for the reasons hereinafter set forth, the application of the provisions of the Zoning By-laws <br />to the following described premises: <br />Petitioner: Stephen & MM E Lempitski 102 Captains Row Mashpee 'MA 02649 <br />(Full name) (Address) (Telephone #) <br />Property Owner: Same <br />(Full name) (Address) (Telephone #) <br />Location of Property: 102 Captains Row Zoning District R-3 <br />(House Number and Name of Street) <br />Assessor's Map/Parcel Number: Map # 96 Parcel # 14 <br />Dimensions of Lot: 72.3 F 223.00' ' Area 22,680 <br />(Frontage) ;,(Depth) (Square Feet) <br />How long have you owned premises? 12/8/93 <br />What is current use of the property? Residential <br />Size of existing buildings on the lot: 38'x24'hse 34'x7' deck, approx 20'xl7' sunroom <br />Size of proposed buildings: <br />State section(s) of the Zoning By-laws and nature of Variance relief requested: 174-25-I-(9) To <br />construct' license and maintain a dock facility. The proposed dock is 92' from MHW (70' regd) <br />Have you submitted plans for above to the Building Department? No <br />Has permit been refused? No <br />Hearing Date set for: <br />I do hereby state that I have conferred with the Building Commissioner on and it <br />has been determined' that this project X does does not fall under the jurisdiction of <br />the Conservation Commission. <br />IL: 2 W 8 L dl 20. - <br />Petitioner's Signature <br />Jobin Slavinsky/Cape & Islan s Engineering <br />800 Falmouth Road, Suite 301 C, Mashpee, <br />{ o MA 02649 508477-7272 <br />
The URL can be used to link to this page
Your browser does not support the video tag.