Laserfiche WebLink
Zoning Board of Appeals <br />Minutes <br />February 1, 2007 <br />EXHIBIT C — INSPECTION PROCEDURES: <br />Charles Rowley's revised draft 1-31-07 re: Inspection Procedures for <br />Mashpee Commons, Jobs -Whiting Neighborhood was reviewed. <br />7. It is the obligation of the Applicant to keep the Consulting Engineer <br />fully informed of the construction activities of the project. <br />8. As final project plans are being developed, the Applicant shall provide <br />the Consulting Engineer with 50% progress drawings. <br />10. d. Typo to read: active opposed to actual. <br />As -Built Plans: <br />1. Added: utilities and other oroiect infrastructure. <br />DESIGN REVIEW PROCESS: <br />40The draft Rules & Regulations Governing Jobs & Whitings Neighborhood <br />Design Review Process dated 1-31-07 was reviewed. <br />Wording; variances was amended to read: variations. <br />Step 5: Schematic Design Review <br />Elimination of schematic plans to Building Inspector <br />Upon written request, any materials submitted at this phase shall be <br />provided to the ZBA Board. <br />Step 10: Modifications During Construction (If Applicable) <br />Added wording: Chances that are both purely cosmetic and non-structural <br />need not be submitted to the Building Inspector and ZBA Board for their <br />recommendation. <br />It was agreed buildings in covenant shall be color coded. <br />Is <br />