Laserfiche WebLink
Toning Board of Appeals <br />Minutes <br />February 1, 2007 <br />DECISIONS AND CONDITIONS: <br />Job's Fishing Road <br />Applicant shall adhere to all local ndes for roadway construction. <br />Jobs Fishing Road shall be constructed "full depth" to Town <br />standard from the intersection of Steeple Street to Route 28. <br />21. Affordable Units Reserved — Local Preference Pool <br />Added: Emnlovees of the Mashnee Water District <br />23: Profit for the Home Ownership portion of the Project <br />Added: requirement for an interim cost and revenue statement <br />after the sale of the 191st residential unit <br />28. Security for Completion of Infrastructure <br />e. Add wording; To include reasonable deadlines for completion <br />of remainine work <br />31. Construction Monitoring Process <br />To read: consultive eneineer opposed to construction monitor <br />Exhibit C, Inspection procedures shall be attached to the permit. <br />Monthly reports to the ZBA during active construction <br />Town Engineer to make recommendations, final decision ZBA. <br />32. Acceptance of Project Roadways <br />Added: through normal statutoryrp ocess in place of procedures. <br />33. To eliminate proposed "civic building" on Lot 129 — Agreed. <br />34. Easements across from Mashpee Commons Park Lot — Clarified <br />Added: Such easements shall guarantee access in at least the <br />manner shown on the Plans <br />35. Lot 209 — Reconfiguration <br />Such reconfiguration shall be shown on Master Plan and <br />Final Site Plans. <br />Delete last sentence wording: must be annroved by the Board <br />It <br />