My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/01/2007 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2007
>
02/01/2007 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 12:42:37 PM
Creation date
2/3/2022 12:39:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zoning Board of Appeals <br />Minutes <br />February 1, 2007 <br />DECISIONS AND CONDITIONS: <br />3. Commercial Uses; <br />a. Retail <br />b. Restaurants <br />c. Office <br />d. Services/Rel) air (Manufacturing is excluded) <br />Add: Laneuaee to provide conditions in service and/or repair that would <br />not eenerate excessive noise to the determent of the neiehborhood. <br />4. Updated Use and Subdivision Plans (Master Plans) <br />Fifth line after wording Board issues its approval of the same. <br />Add: (These plans shall be considered the Master Plans) <br />Updated graphic plans were presented by the Applicant dated 1-31-07 for <br />dissemination to the ZBA Office, Town Clerk, and Town Engineer <br />entitled Use and Subdivision Plans. When the plans are formally <br />approved and the permit is in effect, it was agreed the Master Plan would <br />be signed and dated by the five ZBA Board members voting on this <br />matter. <br />6. Phasing: 35 Day Review Period <br />Added to create an approval process for the project's phases <br />Include wording: The Board may impose such reasonable <br />conditions as may be necessary to implement such phase. <br />7. Typo: Applicant shall allow a 35 day extension of such approval period <br />11. Trash Pick-up — As defined. <br />13. Lots 281 & 282 — As defined. <br />16. Final Site Plans — Drainage System Design <br />To construct in accordance with stormwater management <br />guidelines and the Town Engineer's inspection protocol. <br />Last sentence to revise by adding; for the review and approval of <br />the ZBA Board in consultation with the Town Eneineer. <br />17, Shadow Parking — As defined. <br />'S 18. Waivers — As defined. The matter of waiver requests is resolved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.