McShane Construction Company, Inc. Building Specifications <br /> February 28, 2007 <br /> Project Name: MainSt. Village Phase II <br /> Address: Off Schooner Ln., Mashpee,MA <br /> A. PERMITS & ENGINEERING <br /> 1. Permits- All building through occupancy permits and approvals at contractor <br /> expense. <br /> 2. Engineering- All engineering work, including proposed site plan, standard <br /> title V septic design, topographical survey, and certified plot plan. <br /> B. SITE WORK <br /> 1. All clearing for house, minimum 15 feet around foundation. <br /> 2. Driveway and septic installation. <br /> 3. Title V approved standard septic system; per engineer's plan. <br /> 4. Town Water hook-up, Contractor pays for water hook-up fees up to $200, <br /> Owner pays for excess. <br /> 5. All utilities up to 100' from road. <br /> 6. Any fill brought in or out of job site to be considered an extra. Any rocks <br /> encountered exceeding '/2 cu. yd. To be considered an extra. <br /> C. FOUNDATION AND BASEMENT FLOOR <br /> 1. Foundation- 3,000 p.s.i. poured concrete. <br /> 2. 16"x 8"keyed footings. <br /> 3. 8"x 7'8"- 7' 10"walls. <br /> 4. Basement floor- approximately 3.5" slab (3,000 p.s.i). <br /> 5. Lalli column pads- 30"x30" & 12" deep. <br /> 6. Bilco "C", steel door 6 `0"long, 47'wide, 171/2 " installed over poured <br /> concrete walls. <br /> 7. Damp-proofing- Tar based foundation sealer below grade. <br /> D. MASONRY <br /> 1. Front step pre-cast concrete. Number of steps to be determined by finish <br /> grade of lot. <br /> Initials: Contractor: <br />