Laserfiche WebLink
transverse down it. I can bring documents from the land court. We also have a letter saying <br /> that when a property is turned over the road should be eliminated. Since that has happened, <br /> no one transversed over that road anymore. The road is actually on the sand. Dale <br /> Dougherty said when he bought the property he had the land surveyed and found that road <br /> was 8ft on his own personal property. Deborah Dougherty said people were driving on their <br /> property by 8ft and she once almost got hit. They went to land court over this to shut it off. <br /> Dale Dougherty said every property on that road has a dock. <br /> Mr. Sweet motioned for a negative determination. <br /> Mr. O'Neill seconded the motion. <br /> Vote: 6-1-0 <br /> Roll Call Vote: <br /> Mr.Weeden; yes <br /> Mr.O'Neill; yes <br /> Mr.Sweet; yes <br /> Mr.Colombo; yes <br /> Mr.Smith; yes <br /> Mr. Dalton; yes <br /> Ms. Zollo; no <br /> In favor,6; Opposed, 1; Abstentions, 0 <br /> 6:03 Flat Pond Homeowners Association, 3 Greatfield Landing (New Seabury Dunes Golf NOI- <br /> Course) Proposed treatment and eradication of aquatic invasive species. Representative: LERP <br /> Solitude Lake Management. <br /> Applicant requested a continuance. <br /> Mr. Sweet motioned to continue at the request of the applicant to 1/6/22 at 6:12pm. <br /> Mr. Dalton seconded the motion. <br /> Vote: 7-0-0 <br /> Roll Call Vote: <br /> Mr.Weeden; yes <br /> Mr.O'Neill; yes <br /> Mr.Sweet; yes <br /> Mr.Colombo; yes <br /> Mr.Smith; yes <br /> Mr. Dalton; yes <br /> Ms. Zollo; no <br /> In favor,7; Opposed, 0; Abstentions, 0 <br /> 6:06 23 Ocean Bluff LLC,23 Ocean Bluff Drive. Proposed installation of pool with associated NOI <br /> hardscaping and mitigation plantings. Continued from 11118 for revised plans, narrative <br /> Mike Coutu from Sudbury Design Group presented plans. <br /> Agent said one aspect is that the hardscaping is proposed to go right to the top of the coastal <br /> bank and is requesting the removal of a pitch pine. It was brought up in the initial review, and <br /> there was a potential concern about the safety of the tree so Bartlett Tree Company did an <br /> assessment. The outcome of the assessment rated it as 'moderate risk', which means it's not <br /> justified. I don't consider it necessary, I would ask to look at a different configuration. <br /> Mike Coutu said they've looked at alternative layouts, and spoke with Bartlett. The proximity <br /> of the excavation to the pond would put the tree at further risk. Bartlett recommended not to <br /> increase the risk. We looked at other layouts but they weren't feasible. <br /> Agent asked about reducing the footprint, Mike Coutu said in order to be a therapeutic pool it <br /> has to be a certain size. Assistant Agent asked about moving it more towards the north, Mike <br />