Laserfiche WebLink
The following text has been,added to the rias attye, ,.The large infiltration basin, located in the southern <br /> portion of the site, is equipped with two cells that are separated by a flow control structure. This flow <br /> control structure will be equipped with a concrete weir that has a slot that a wood barrier could be <br /> temporarily installed to obstruct flow and locally contain the spill within the forebay. Bioretention <br /> facilities also funrction in a manner to localize spills to one area dile to their shallow,depressions and the <br /> ms <br /> systenothavingpiped outfalls as a discharge ,method. Contaminated soil material then can be <br /> excavated and disposed of in an approved offsite location. " <br /> 6, It is not clear where rip rap slope protection is to used and how it will be constructed. <br /> See response to Comment C:3. <br /> 7. Responsible party for operation and maintenance of drainage system. <br /> The following text has been added to the narrative: <br /> O&V Responsible Party: <br /> Association: <br /> Main Street Village Housing Association <br /> Lettie Lane,Route 130 <br /> Mashpee,MA 02649 <br /> Association Developed by: <br /> McShane Construction, Inca <br /> Pill Box 429 <br /> Osterville, Mass. 0655 <br /> 8. Comments on pre to post-development HydroCad`Model. Are building roofs and driveways <br /> included in the impervious area calculations? Arewood chip areas modeled as such? Surfaces <br /> not covered by forest or grass may increase runoff even further. <br /> All building roofs and driveways have been included inthesizing of all drainage structures and have <br /> beeli modeled as impervious (CN=98). The site will not be covered with wood chips as the previous <br /> application booklet stated. Runoff is increased from Pre to Post-development, however the proposed <br /> drainage system provides attenuation and treatment ofstormwater in accordance with state and local <br /> regulations. <br /> 9. Bioretention systems, rip rap.overflow structures and frozen ground conditions. <br /> We have addressed the concerns of how the bioreteuion systems and rip rap overflow structures will <br /> function with the updated Plan (Plan View—Sheet 5 and Details_Sheet 6) and the response to Comment, <br /> C3. All bioretention facilities have been re'vi'sed to include an emergency overflow system that either <br /> discharges to the large infiltration basin to the south of the parcel or to a frozen ground"overflow <br /> recharge basin, which are located within the,bioretention areas. .All fi-ozen ground recharge basins are . <br /> sized for the 25 year 24-hour storm in Accordance with Town regulations.(see Frozen-Ground <br /> Conditions Analysis,.dated March 5, 2004). <br /> Response Letter - Horsley Witten Group _ <br /> -MainStreet Village (Lettie-Lane)Mashpee,MA ._March 5,2004 <br /> Horsley Witten Group <7 `r- <br /> .53,9 b: vq'v.']'P .. 1 •Q)U`%C7 �k . <br />