Laserfiche WebLink
. The applicant will prepare anew Land Court Plan that will be submitted under a•separate cover. <br /> Section 5:A. McShane Construction Co. Landscape Building.Specifications—driveways constructed of <br /> 3/8"to `h"Bluestone and all other areas except 1,000-square feet of lawn will be treated with wood chips. <br /> All driveways with slopes ofgreater than 3%will be paved asphalt. All disturbed areas will be re- <br /> established with vegetation with either loam and grass or plantings. A Planting Plan will be included <br /> with the Definitive Plan submission. <br /> H. Stormwater Management and Drainage Narrative and Wastewater Treatment System Narrative. <br /> A. The document should be stamped by the professional who prepared it. <br /> The document has been stamped and signed by Richard Claytor, PE. <br /> B. Wastewater concerns within a Zone II water supply protection area. <br /> The proposed wastewater system has been provided to the Board of Health for their review. <br /> C. Storm Water Drainage Design <br /> 1. The drainage system is designed to capture and treat the fust 1"of rainfall in compliance with <br /> Regulations. <br /> These regulations are still being met by the revised design. <br /> 2. . Best management practices of open channel swales, bioretention facilities,infiltration and <br /> drainage piping are all used within the development to attenuate storm water runoff. <br /> The revised drainage system continues to implement the BMP's listed above with the addition of curbing <br /> where grades exceed 3% deep-sump catchbasins where roadside grass-channels cannot be constructed <br /> for pretreatment, and overflow infiltration basins (leachingpits)for groundwater recharge and <br /> attenuation during-frozen ground conditions. <br /> 3. Details of the bioretention facilities and overflow rip rap structures are requested. <br /> The applicant has.provided a Typical Bioretention Facility Detail and Rip Rap Outfall Detail on Sheet 6, <br /> as requested. Also, the location of-the bioretention emergency overflow structures are shown in the Plan <br /> On Sheet 5, labeled EOF. These structures provide emergency overflow for an extreme event (>100 yr, <br /> 24-hr storm) and continue to discharge flows to Route 130 that are below the pre-development discharge <br /> rate (see Drainage Calculations). The following description has been added to the narrative, "The weir <br /> structures are simple 3-foot wide rip-rapped overflow weirs, set at an elevationbelow the surrounding <br /> rim elevation.of the bioretention system". <br /> 4. . Description of measures for Spill containment and emergency shut-down. <br /> Response Letter - Horsley Witten Group. <br /> MainStreet Village(Lettie Lane)Mashpee,MA 2' - March 5,2004 <br /> Horsley Witten ,Group <br /> Swear We Ep-,-yommsnia I sola'/or .,� <br />