My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/25/2004 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2004
>
02/25/2004 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 12:00:17 PM
Creation date
2/10/2022 11:57:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee Zoning <br /> Board of Appeals Minutes <br /> 3 February 25, 2004 <br /> units. If and when another approval letter comes forth, they will plug in another 8 units <br /> totaling 24 units at another filing with the ZBA possibly in the future. However, due to <br /> time constraints with Mass Housing, it is in petitioner's best interest to move forward <br /> with what they have been approved for since Mass Housing is so backed up and that <br /> would likely produce more delay. Mr. Kirrane informs the Board that they are <br /> presenting: <br /> ✓ 8 detached houses <br /> ✓ 8 attached houses <br /> ✓ 16 single family houses <br /> They will be providing 31% of this as affordable housing. Five will be the actual <br /> "affordable" housing which constitutes earning 80% of the median income and one house <br /> will be "moderately affordable"which will allow the potential home owner to earn 120% <br /> of the median income. The remaining 10 homes will be market value. The affordables <br /> will run about $108,000 - $142,000; the moderately affordable will run $249,000 and the <br /> market homes will run about $175,000—385,000. The overall density is about 2.17 units <br /> per acre. The local Affordable Housing Committee has given their support for this <br /> project. Charles Rowley, Consulting Engineer for the Town has submitted a detailed <br /> letter with his questions and comments about the project to the Board. The letter is very <br /> detailed and has many questions that the Board would like to see answered in a <br /> satisfactory manner. Mr. Kirrane and Mr. Claytor discuss drainage issues and well as <br /> many other detailed items in Mr. Rowley's letter. The Board would like to take Mr. <br /> Rowley's letter and line item each question at the next hearing. Mr. Brem discusses how <br /> the affordable houses will differ both in quality and aesthetics to the neighborhood. A <br /> discussion takes place about the quality of products Mr. McShane plans on using for <br /> cabinets, appliances etc. Mr. Brem would like to see a list of what is being used for the <br /> affordable vs. the market homes. Mr. McShane states that if a potential client wishes to <br /> spend more money on upgraded appliances and interior items that is their choice and thus <br /> why the market homes cost more money. The affordable homes are just that—affordable <br /> and builder quality items will be used to keep the cost down for the potential homeowner. <br /> Mr. Nelson introduces questions about how the roadway will be affected with both the <br /> commercial project and the residential project. Part of the road will be fronting the <br /> commercial property thus would a 40 foot wide roadway be the way to go? He also <br /> addresses the problem of sewer and drainage run-off from the commercial property into <br /> the residential property. Mr. Claytor discusses in detail the components of the drainage <br /> system as well as the fact that the money that will be spent installing this system will be <br /> appropriately delegated between the commercial portion and the residential portion. Mr. <br /> Rowley states is it difficult to make overall statements looking at the commercial and <br /> residential portions of this project as two different entities when they in fact are tied <br /> together very closely. Mr. Teague and Mr. Claytor discuss the flow data and that fact <br /> that there will be 31 bedrooms in total to be concerned with. Mr. Nelson also discusses <br /> the fact that the grade is very tough and will be a problem, run-off is a problem as well. <br /> Mr. Claytor mentions that the Planning Board wants to see roadside swales which is a <br /> closed drainage system—they would like to come to a compromise about that and <br /> possibly install a partially closed system—they decide to meet with Mr. Rowley to <br />
The URL can be used to link to this page
Your browser does not support the video tag.