My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/12/2003 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2003
>
03/12/2003 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 3:23:07 PM
Creation date
2/11/2022 3:19:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17J <br />0 <br />Imai Keller Moore Architects <br />Chief George Baker <br />Deputy Chief Sheldon Hamblin <br />3 April 2003 <br />- 2 - <br />6. We will have the fire protection drawings reviewed by a third party <br />by peer review by a second fire protection engineering consultant. We <br />will look into this and propose a review process to the Fire <br />Department. <br />7. There will be a smoke control hatch on the top of each stairwell, <br />equipped with a heat -fusible link. The hatch will be designed so that <br />Fire Department personnel can open the stair hatches from the outside. <br />8. The separation between Building 16 and Building 12 is 10'-6". The <br />Massachusetts Building Code requires a 1 -hour exterior fire resistance <br />rating (from the inside) for use group M, reduced to 0 hours because <br />there is an automatic sprinkler system throughout. There is a 0 hour <br />rating required for the residential uses on the second floor. Please <br />note, this item differs from the discussion we had in your office. At <br />that time we had discussed the possibility of exterior sprinklers, but <br />these are not required by the Code. If you so desire, we will provide <br />exterior sprinklers on this building (manually controlled by the Fire <br />Department). <br />9. It is proposed that there will be built-in fire suppression at the <br />kitchen stove in each apartment. We will submit specification on the <br />system and its viability as the design develops. <br />10. We will investigate the NFPA 101 suggestions for high and low exit <br />signs and review this with you to see if it is appropriate for this <br />building. <br />11. During construction, the Fire Protection Engineer will submit a <br />report to the Fire Department following a review of the installation of <br />the sprinkler system. <br />12. We will develop loading areas for the design of Buildings 17 and <br />review them with the Fire Department to coordinate fire lane <br />locations. <br />137) We have retained R.W. Sullivan, a registered fire protection <br />engineer, to assess the automatic fire protection systems in Buildings <br />14 and 11A. They will be in contact with your department shortly. <br />They will also look at providing a fire protection system for Building <br />6 at the same time. We understand this is a priority with the Fire <br />Department. jIt is our intent; unless—the physical and financial T <br />rconsiderations are deemed to be unresonable, to complete the ' <br />1L recommendations of'R. W. Sullivan. <br />We appreciate your willingness to work with us to arrive at a mutually <br />acceptable solution that will enable you to comfortably support our <br />variance request. <br />
The URL can be used to link to this page
Your browser does not support the video tag.