My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/26/2003 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2003
>
03/26/2003 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 3:26:35 PM
Creation date
2/11/2022 3:24:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee Zoning <br />Board of Appeals John Belland <br />1 SP -03-41 <br />• SPECIAL PERMIT CRITERIA <br />Section 174-25.I.9 states that the Board must find that the structure will not <br />unduly interfere with the free passage of travel by water or land or cause to contribute <br />to the substantial disruption or degradation of the marine or coastal environment. <br />GENERAL FINDINGS <br />1. that the subject property is located at 44 Barbary Circle and contains 25,100 <br />square feet. <br />SPECIFIC FINDINGS <br />The Board determined that: <br />1. the existing dock will be an accessory to an existing dwelling and is a <br />permissible use upon the grant of a Special Permit. <br />2. the proposal has been approved by the Shellfish Constable whose <br />responsibilities include protection of the marine environment. <br />3. the proposal has been reviewed by the Conservation Commission to address <br />impacts on the coastal environment. <br />4. the use is in harmony with the general purpose and intent of the By-laws. <br />5. the owner has rights to maintenance in perpetuity. <br />6. filing with the State DEP Wetlands Program shall be considered execution of <br />the Special Permit. <br />In view of the foregoing, the Mashpee Zoning Board of Appeals found that the <br />Petitioner met the criteria necessary for the granting of a Special Permit. Upon motion <br />duly made and seconded, the Zoning Board of Appeals voted unanimously on March 26, <br />2003 to grant a Special Permit on the subject property. The Special Permit is conditioned <br />on plans from Falmouth Engineering, dated February 4, 2003, Project No. 02149, CAD <br />File Name 02149SP as prepared for John Belland. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.