Laserfiche WebLink
Mashpee Zoning Minutes—January 12, 2000 9 <br /> Board of Appeals <br /> 3. that no maintenance or servicing(such as, but not limited to, oil change, <br /> washing, repairing) of vehicles shall be done on the subject property. 1+� <br /> 4. that no signage (other than on the vehicle for sale) advertising sale of vehicles t <br /> shall be erected on the subject property. <br /> 5. that no cube or box trucks for sale shall beparked on the subject property. <br /> 6. that the sale of only full-size vans or vehicles shall be allowed on the subject <br /> property. <br /> 7. that the Special Permit shall expire one year from the date that the Zoning <br /> Board of Appeals has filed it with the Town Clerk. <br /> 8. that the applicant must request a renewal of the Special Permit from the <br /> Zoning Board of Appeals at least one month before the expiration of the , <br /> Special Permit. <br /> 9. that the Zoning Board of Appeals shall review the Special Permit for renewal. <br /> Mr. Regan seconded. All agreed. <br /> John J. &Anne V. Hauss, Sr.—Request a Special Permit under Section 174-20 <br /> of the Zoning By-laws for permission to demolish an existing structure and build a <br /> single-family home on property located in an R-3 zoning district at 15 Seaview ' <br /> Avenue (Map 118 Block 45)Mashpee, MA. 1 <br /> John J. &Anne V.Hauss, Sr. —Request a Variance from Section 174-31 of the Zoning <br /> By-laws to vary the lot coverage to allow for construction of a single-family home on <br /> property located in an R-3 zoning district at 15 Seaview Avenue (Map 118 Block 45) ! '� <br /> Mashpee, MA. w <br /> Sitting: Edward M. Govoni, James E. Regan III and Robert G. Nelson. <br /> Mr. David Sanicki of Cape &Islands Engineering represented the applicants,who also <br /> attended the meeting. Mr. Sanicki referred to the plans and said that a Variance of 1.6% M <br /> from the lot coverage requirements is being sought for construction of the new home. <br /> �.� <br /> No comments were received from abutters. +„ <br /> Mr. Regan moved to grant a Variance of 1.6% from the lot coverage requirements, <br /> subject to criteria 1, 2, 3, 4 and findings 1, and that the installation of the new septic y k <br /> system would be an improvement to the property. Mr. Nelson seconded. All agreed. <br /> Mr. Regan moved to grant the Special Permit, subject to criteria/findings: that the kp� <br /> installation of the new septic system would be an improvement to the property,that the x! <br /> new construction will not be more detrimental than the previous construction, 1, 4, 5, 6. ' <br /> Mr. Govoni seconded. All agreed. , <br /> Little Neck Realty Trust—Requests a Variance from Section 174-33 of the Zoning <br /> By-laws to vary the setback from water and wetlands to allow for construction of a <br /> ; <br /> single-family home on property located in an S-3 zoning district at 44 Little Neck <br /> It1T E <br /> �r <br />