My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2000 ZONING BOARD OF APPEALS Minutes
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
2000-2009
>
2000
>
05/10/2000 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 11:36:19 AM
Creation date
2/22/2022 11:35:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee Zoning Minutes—May 10, 2000 <br /> Board of Appeals 9aea.►' <br /> Kenneth E. Litvack& Bertha Chang-Litvack—Request a Special Permit under Section <br /> 174-2519 of the Zoning By-laws for permission to construct a pier, ramp and float on <br /> Popponesset Creek on property located in*an R-3 zoning district at 11 Taffrail Wayt <br /> (Map 106 Block 7)Mashpee, MA. ; <br /> Continued from March 22,2000 at engineer's request. <br /> Sitting: James E. Regan III, Frederick R. Borgeson and Richard T. Guerrera. <br /> Mr. David Sanicki of Cape & Islands Engineering represented the applicants. Mr. Regan <br /> read the memo from the Shellfish Constable requesting that float stops shall be installed <br /> to keep the float at least two feet above the bottom to prevent negatively impacting <br /> shellfish productivity. Mr. Sanicki said that the Conservation Commission indicated that cb #,car <br /> it would require construction of the float stops. <br /> No comments were received from abutters. <br /> Mr. Guerrera moved to grant the Special Permit, subject to findings 1, 2, 3, 4, 5, 6 &per .Ir-ft*w <br /> Conservation requirements. Mr. Regan seconded. All agreed. 41 <br /> Stephen M. & Sarah A. Daley—Request a Variance from Section 174-31 of the Zoning ` <br /> By-laws for permission to vary the side and front setback requirements to allow for <br /> . l <br /> construction of a deck to an existing dwelling on property located in an R-3 zoning ;?4ft <br /> district at 219 Waterway(Map 111 Block 74) Mashpee, MA. <br /> Continued from April 26, 2000 to allow applicant opportunity to submit engineered <br /> plans. gCr <br /> Sitting: James E. Regan III, Robert G.Nelson and Richard T. Guerrera. <br /> The Board received a letter from the applicant requesting that the Board grant a Variance, <br /> pending delivery of the certified plan to the Board. The Board voted unanimously to <br /> deny the request and continue the hearing until June 14, 2000. <br /> MINUTES <br /> Mr.Nelson moved to accept the Minutes of April 26, 2000 Public Hearings.. Mr. Regan <br /> seconded. All agreed. �!:p <br /> .p <br /> ppE�l��ll�r <br /> Meeting was adjourned at 10:45 P.M. <br /> Respectfully submitted, <br /> tNap� r <br /> Cynthia Bartos "kynr <br /> Administrative Secretary <br /> M <br /> p'. <br /> �t <br /> 4 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.