Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> FEBRUARY 9,2022 <br /> The second issue; the garage structure that was in front of the building between the home <br /> and Sand Dollar Lane was originally attached to a pergola to the home is now attached to <br /> the building, and the pergola was removed. <br /> At the last meeting it was demonstrated that a lot of the setback criteria had dramatically <br /> improved. Some only with slight improvement, but now that this is a 2-1/2 story building <br /> as opposed to a 3-story building,the Board would be well in its jurisdiction and discretion <br /> to make a determination that what is being proposed is not substantially more detrimental <br /> to the neighborhood than what currently exists. <br /> Attorney Kirrane noted that the Conservation Commission approved the landscape plan, <br /> and the septic design concerns raised by Glen Harrington, Board of Health Agent had been <br /> resolved with respect to the garage plan that is now attached to the building. <br /> Chairman Furbush asked someone to provide the definition of a half story in regard to the <br /> newly designed building on the revised plan. <br /> Attorney Kirrane said that the revised plan is a result of the conversation that Mr. <br /> Dauphinais had with Dave Morris, and he believes based upon the knee walls, and the <br /> square footage of the floor above the floor below now qualifies. <br /> Dave said when this project was first presented it had retaining wall all around the whole <br /> house, and seemed to be 8 ft. tall. He said that the new plan now has many changes. In <br /> regard to the South elevation the only retaining wall is located at the driveway and is a <br /> reasonable height into the embankment. The area near the foundation does not have a <br /> retaining wall except the area near the flood plain design level. He said it has improved <br /> significantly. The basement is now the first floor and is above the design level. The second <br /> floor is fine, the third floor is the question before the Board, is this a true half story above <br /> grade. He mentioned that it does not exceed two thirds of the floor area of the story <br /> immediately below. He believes that there's about 55%. The last item that the Board needs <br /> to decide is that any exterior wall of said half-story shall be setback a minimum of two feet <br /> from the wall plain of the story immediately below it. The roof line that divides the wall <br /> would be allowed. The question is if the area is considered a dormer or a wall. <br /> Jonathan questioned the right side of the West Elevation plan depicting the straight wall <br /> that looks like the roof is set in. He asked if it is considered a half story or not. <br /> Mr. Gallagher said that the roof gives that as an optical allusion as set in, but is not set in. <br /> He said that the roof sticks out from the wall. He said that the bylaw was originally written <br /> typically called for two and a half stories, the roof area would be the half story that is <br /> occupied. But it allows for an exterior wall,and should have meant interior,and was written <br /> wrong. He doesn't believe it meets the 2 ft. setback and does not meet the bylaw as a half <br /> story. The vertical exterior wall has to be set back two feet. <br /> 2 <br />