Laserfiche WebLink
Mash pee Zoning g Minutes—October 27, 1999 <br /> Board of Appeals <br /> 3 <br /> : <br /> Mr. costa stated that the layout of the road curve s into the front yard and,therefore,the <br /> proposed addition of the porch would not meet the,.fron <br /> tage requirements. He also stated <br /> that the house was built very close to the front o -fthe 12,So0 square foot lot. Mr. costa <br /> said that sauna tubes would be cantilevered from the existing foundation. He said that the - <br /> measurement from the berm of the pavement to one side of F�, • the foundation is 4S feet, , <br /> from the middle of the foundation is 47 feet and from the other side of the foundation is <br /> 46 feet. <br /> .rpn' <br /> Mr. Costa also submitted letters from abutters approving the proposal. <br /> No other comments were received from abutters. <br /> Mr. Nelson moved to grant a Variance of 7 feet on the northeasterly corner of the subject <br /> lot, subject to criteria: 2,3,4 and findings: location '. g n of the dwelling on the lot and on <br /> submission of an engineered plan showing the requested Variance. Mr. Guerrera <br /> seconded. All agreed. <br /> 6 <br /> Lohr& Sons Inc.--Request a Variance from Section •174-32 of the Zoning By-laws for <br /> permission to construct a single-family home on an unpaved av p ed road on property located in I i h? <br /> an R-3 zoning district at 19 wessagusset Avenue(Map 6 5 Block 37E�Mashpee, MA. x. <br /> Sitting: James E. Regan III, Robert G.Nelson and Richard <br /> T. �uerrera. <br /> Mr. Wesley A. Lohr represented the a location. He su 'V� <br /> pp omitted plans and photos of the <br /> lot, sections of which are not within 150 feet of a pave <br /> d d road. He stated that the road is in <br /> good condition, is wide enough and has overhead clearance to allow for access of fire and <br /> emergency apparatus. <br /> r �A <br /> Mr. Regan referred to an abutter, Jim Heal who was cone - <br /> Y� concerned with construction that <br /> had been started on the subject lot prior to the Zoning Board of Appeals hearing. <br /> Construction was stopped and will not commence until after Board approval and the <br /> 20-day appeal period. Mr. Regan read a letter from the fire de 'department with concerns <br /> regarding access to the home with fire and emergency apparatus. <br /> g Y pp <br /> Mr. Lohr informed the Board that the ' <br /> lot is in the center of two roads that can be used to <br /> access the home. <br /> I <br /> Mr. S lavinsky, the engineer for the project, stated that a 10-whe •0-wheeler truck with a trailer <br /> and a backhoe drove down the subject road and had no problem m p aneuvering in and out � <br /> of the road. E ,, <br /> F <br /> Mr. Borgeson also confirmed that he drove throw neighborhood�►the gh borho od and stated that <br /> there is plenty of room for fire apparatus to access the home.proposed e. He also said that <br /> the location is close to two paved roads. r <br /> No other comments were received from abutters. , :! <br /> v <br /> � a� <br />