My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/14/1998 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1990-1999
>
1998
>
01/14/1998 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 11:04:56 AM
Creation date
2/25/2022 11:04:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Appeals Mashpee Industrial Park TR. - Telecommunications Tower 5. <br /> 8. The Mashpee Industrial Park Trust shall be responsible to insure that the Facility is <br /> maintained in good condition. Such maintenance shall include, but shall not be <br /> limited to, painting, structural integrity of the mount and security barrier, and <br /> maintenance of the buffer areas and landscaping. <br /> 9. At such time that the Mashpee Industrial Park Trust plans to abandon or <br /> discontinue operation of the Facility,it will notify the Town by certified U.S. mail <br /> of the proposed date of abandonment or discontinuation of operations. Such <br /> notice shall be given no less than 30 days prior to abandonment or discontinuation <br /> of operations. <br /> 10. Upon abandonment or discontinuation of use of the Facility, the Mashpee <br /> Industrial Park Trust shall physically remove the Facility within 90 days from the <br /> date of abandonment or discontinuation of use. "Physically remove" shall include, <br /> but not be limited to: <br /> *removal of antennas, mount, equipment shelters and security barriers from <br /> the subject property <br /> -proper disposal of the waste materials from the site in accordance with <br /> local and state solid waste disposal regulations <br /> *restoring the location of the personal wireless service facility to its natural <br /> conditions, except that any landscaping and grading shall remain in the after <br /> condition. <br /> 11. If the Mashpee Industrial Park Trust fails to remove the Facility, the Town shall <br /> after written notice at least 30 days prior to such action, have the authority to enter <br /> the subject property and physically remove the facility. The Mashpee Industrial <br /> Park Trust shall be required to post a$10,000 bond for fifteen(15)years at the <br /> time of construction to cover costs for the removal of the Facility in the event the <br /> Town must remove the facility. <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.