My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/09/1998 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1990-1999
>
1998
>
12/09/1998 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 2:39:34 PM
Creation date
2/25/2022 2:39:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Appeals Todd Sullivan SP-98-152 2 <br /> FWDINGS <br /> General Finding <br /> 1. the subject property is located at 66 Red Brook Road and consists of 30,485 <br /> square feet. <br /> Special Permit Criteria <br /> Section 174-17 of the Mashpee Zoning By-laws and Massachusetts General Law <br /> Chapter 40A, Chapter 6, require a finding that the extension, alteration or change shall <br /> not be substantially more detrimental to the neighborhood than the existing non- <br /> conforming use. <br /> Specific Finding <br /> I. the proposed construction conforms to the setback requirements. <br /> 2. the changes between the proposed construction and the prior one will result in <br /> an increase in lot coverage, but it is under the allowed 20%. <br /> 3. there is adequate land to provide sufficient parking. <br /> 4. the immediate neighborhood consists of single-family homes of similar size. <br /> 5. the proposed construction will be a vast improvement to the neighborhood. <br /> In view of the foregoing, the Mashpee Board of Appeals found that the applicant <br /> met the criteria necessary for the granting of a Special Permit. Upon motion duly made <br /> and seconded, the Board of Appeals voted unanimously on December 9, 1998 to grant the <br /> Special Permit, subject to the following conditions: <br /> 1. compliance with plans of Cape& Islands Engineering, dated <br /> February 13, 1998. <br /> 2. demolition of the existing storage shed upon completion of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.