My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/1997 ZONING BOARD OF APPEAL Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1990-1999
>
1997
>
11/12/1997 ZONING BOARD OF APPEAL Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 10:47:37 AM
Creation date
2/28/2022 10:44:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Appeals Mashpee Industrial Park TR. - Telecommunications Tower 4. <br /> 3. The Mashpee Industrial Park Trust shall, prior to construction, provide a statement <br /> listing the existing and maximum future projected measurements of RFR from the <br /> Facility, for the following situations: <br /> • Existing or ambient: the measurements of existing RFR. <br /> • Existing plus proposed personal wireless service facilities: maximum <br /> estimate of RFR from the Facility plus the existing RFR environment. <br /> • Certification, signed by a RF engineer, stating that RFR measurements <br /> are accurate and meet FCC Guidelines. <br /> 4. The Mashpee Industrial Park Trust shall prior to construction list the location, type <br /> ` and amount (including trace elements) of any material proposed for use within the <br /> Facility that are considered hazardous by the federal, state or local government. <br /> 5. A Modification to the Special Permit will be required when: <br /> • the Mashpee Industrial Park Trust wants to alter the terms of the <br /> Special Permit by changing the Facility in one or more of the following <br /> ways: <br /> (a.) Change in the maximum number of uses permitted on the site; <br /> (b.) Change in technology used for the Facility, which would <br /> substantially impact any of the resources listed in Section 174-24 of <br /> the Mashpee Zoning Bylaws; and, <br /> (c.)the Mashpee Industrial Park Trust wants to add any equipment <br /> or additional height not specified in this decision. <br /> • the Mashpee Industrial Park Trust shall report to the Board of Appeals <br /> any change in technolgy described above. <br /> 6. After the Facility is operational, the Mashpee Industrial Park Trust shall submit, <br /> within 90 days of beginning operations, and at three (3) year intervals from the <br /> date of issuance of the Special Permit, existing measurements of RFR from the <br /> Facility. Such measurements shall be signed and certified by a RF specialist, <br /> stating that RFR measurements are accurate and meet FCC Guidelines. <br /> 7. After the Facility is operational, the Mashpee Industrial Park Trust shall submit, <br /> within 90 days of the issuance of the Special Permit, and at three (3) year intervals <br /> from the date of issuance of the Special Permit, existing measurements of noise <br /> from the Facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.