My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/12/1997 ZONING BOARD OF APPEAL Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1990-1999
>
1997
>
11/12/1997 ZONING BOARD OF APPEAL Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2022 10:47:37 AM
Creation date
2/28/2022 10:44:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Appeals Mashpee Industrial Park TR. - Telecommunications Tower 6. <br /> 12. The Special permit issued to the Mashpee Industrial Park Trust shall be valid for <br /> fifteen (15)years. At the end of that time period, the Applicant shall be required <br /> to obtain an extension of the special permit, which may be granted for an <br /> additional period of up to fifteen (15) years. The Board of appeals shall grant such <br /> an extension if the Applicant has conformed with the conditions of this special <br /> permit. The Board of Appeals may also thereafter grant such further extensions as <br /> the Board may deem appropriate, based upon available technology and public or <br /> private economic needs for such a facility at that time. <br /> 13. Any interference with television, including cable, satellite, radio and other existing <br /> wire and wireless transmission due to this Facility shall be the responsibility of the <br /> Mashpee Industrial Park Trust to investigate and remedy in an expeditious manner. <br /> 14. The Town of Mashpee will have use of the Facility at no cost to the Town. <br /> 15. The structural integrity of the tower will be confirmed by the certification of a <br /> certified structural engineer. <br /> 16. The tower will be designed with a failure design such that the fall zone in the event <br /> of failure will be within the property lines of Lot 28. <br /> 17. At no time shall the total number of users of the Facility exceed twenty(20), not <br /> including municipal and/or public safety users given free locations on the Facility <br /> by the Applicant. <br /> 18. Bonds: in addition to the $10,000 bond required in Condition 11, the Mashpee <br /> Industrial Park Trust shall post a landscape bond of$5,000 cash to be held in an <br /> interest-bearing account by the Town Treasurer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.