Laserfiche WebLink
Board of Appeals Minutes -February 22, 1995 4. <br /> Daniel J. Donahue - (Continued from January 11, 1995) <br /> Members sitting: J. Regan, C. Hawver, K. Marsters <br /> Architect Allen Osgood, Engineer Paul Ryll and Attorney James Mc Neill represented the <br /> applicant. Mr. Osgood presented a revised plan with a single entrance drive and smaller building. <br /> He said they would also have a water retention system. He said that Design Review had asked <br /> for lighting, sign, landscape and dumpster plans which will be presented on March 8. They will <br /> continue to use the existing buildings for storage of construction equipment. The storage bins <br /> will have a gravel base and will be used for wood chips, gravel, bark mulch and loam. He said <br /> 34.8% of the lot coverage will be impervious, There was a question if Board of Health had_ <br /> approved the revised plan. <br /> Mr. Marsters questioned how site will be used for contractor's storage and Mr. Osgood said <br /> that the rear of the lot beyond the chain link fence will continue to be used for storage and the <br /> area in front of the fence will be used for retail. The access to the rear will be used by the new <br /> entrance. Mr. Osgood stated that the garage section of the building will be used for fertilizer, <br /> etc. and Mr. Regan suggested that any decision be conditioned that pesticides, fertilizer, etc. be <br /> stored within the garage area. Ms. Hawver read memos from Public Works and Planning into <br /> the record. <br /> Mr. Govoni and Mr. Hauck reviewed the Zoning By-laws and determined that lot coverage of <br /> 30% is permitted in the Groundwater Protection District. Mr. Ryll stated that some of driveways <br /> could be gravel. Mr. Hauck said Design Review would be scheduled for March 8 and Ms. <br /> Hawver suggested the Board of Appeals will continue hearings to March 22 but will need a time <br /> extension on the Variance application. Mr. Mc Neill granted the extension. <br /> Mr. McNeill stated that the proposed use meets the requirements for a Special Permit and they <br /> have eliminated the need for Variances except for lot coverage, He said it was a valid pre- <br /> existing non-conforming use and would be improving the site with a drainage system. <br /> Mr. Regan moved to take the Petition under advisement and grant an extension in the Variance <br /> application for 60 days. Ms. Hawver seconded. All agreed. <br /> Design Review-Mr. Govoni moved to appoint James E. Regan III as the Board of Appeals <br /> alternate member on the Design Review Committee. Mr. Marsters seconded. All agreed. <br /> Kathryn Lapio - (January 25, 1995 meeting) -Mr. Govoni moved to grant the request for a 90- <br /> day extension in the hearing calendar on Kathryn Lapio. Mr. Regan seconded. All agreed. <br /> Minutes -Mr. Govoni moved to accept the Minutes of January 25 and February 8, 1995, Ms. <br /> Hawver seconded. All agreed. Mr. Govoni moved to adjourn at 9:30 P.M. <br /> i <br /> Elinor Walsh j <br />