My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/21/1996 PLANNING BOARD Minutes
>
02/21/1996 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2022 5:00:33 PM
Creation date
3/8/2022 11:26:43 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
02/21/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� n,'op .-W <br /> Tom thinks the plan makes sense. He suggested a possible 9,,I <br /> relocation of the road at the Deer Crossing end. This plan shows <br /> it connecting <br /> to the Bank's driveway which doesn't connect to �► ;'.�1'i <br /> anything else. + <br /> Fields Point owns the land connected to Jobs Fishing Road so they <br /> need to participate. <br /> i <br /> Tony asked if any Board member thought is wasn't a good idea? kill" <br /> They did not. II a� Iy <br /> Tony explained to Mr. Canning that the Board reacts favorably to <br /> this discussion. It is not yet in the preliminary plan stage. MI & I+ <br /> Tom has raised a valid issue. The Board would want to see that . � If <br /> driveway laid out when the plan is presented. <br /> John asked if the additional traffic created will create a safety <br /> hazard for the Deer Crossing residents? Maybe the road needs <br /> extra width. <br /> Tony said it is only a short road, you can't really pick up <br /> speed. <br /> Tom said there is no parking on the road, and probably not much <br /> traffic. <br /> Charlie said 22 feet of pavement is now required, it could be <br /> widened to 24 feet. <br /> Tony told Dr. Canning the standard is 20 feet with burms, the <br /> Board will ask his engineer to look at that issue. a <br /> Dr. Canning said his engineer will lay it out exactly where the <br /> r ','ill <br /> road ends - at Deer Crossing. j°� <br /> A. <br /> ► yy <br /> Dennis will this plan to the attention of the Mashpee Commons <br /> Committee. <br /> (Charlie Rowley left the meeting) <br /> RELEASE OF PERFORMANCE GUARANTEE <br /> Applicant: Peter Michaelson/Tony Bexley <br /> Location: Lots 55 and 43 Winslow Farms +;�a .��III <br /> Request: Release of covenant. •dl!"." ; <br /> d <br /> Tony ,explained to the other Board members their previous � -3 <br /> ;.1 � ,;,( <br /> discussion with Mr. Bexley. They have 2 lots which have been "A III,'., <br /> previously released from covenant and 2 which are under covenant. <br /> Mr. Michaelson wants to swap them. �° � ' ";u►.° ' <br /> Tom said both sets of lots have the same road conditions, the <br /> roads were never finished but this fall the applicant told the Board he will finish the roads. �I <br /> ** Martine made a motion to release the covenant on lots 43 <br /> and 55 and covenant lots 24 and 25. Dennis seconded the y; <br /> motion. All members were in favor 3-0.** <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.