My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/14/1994 ZONING BOARD OF APPEALS Decisions
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1990-1999
>
1994
>
12/14/1994 ZONING BOARD OF APPEALS Decisions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 1:01:22 PM
Creation date
3/14/2022 12:51:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of Appeals Marcel J. Murad SP-94-88 2 . <br /> Findings : <br /> a. General : <br /> 1 . the dock is accessory to an existing dwelling <br /> situated on a 17 , 070 sf . lot on Great River. <br /> The parcel is situated in the R-3 zoning <br /> district, and an accessory pier is a <br /> permissible use within that District upon grant <br /> of a Special Permit from the Zoning Board of <br /> Appeals . <br /> N 2 . the length of the proposed <br /> pier,- ramp and float <br /> complies with the provisions of the by-laws . <br /> b . Special Permit Criteria: <br /> Section 174-25 . I .9 states that the Board must find <br /> that the structure will not unduly interfere with <br /> free passage of travel by water of land or cause or <br /> contribute to the substantial disruption or <br /> degradation, through direct or indirect impacts , <br /> including uses allowed by said structure, on the <br /> marine or coastal environment . <br /> c . Specific Findings : <br /> 1 . the proposal has been submitted to and <br /> approved by the Mashpee Conservation <br /> Commission whose primary responsibility is to <br /> address impacts of such uses and structures on <br /> the marine and coastal environment . <br /> . 2 . the applicants have been sensitive to the <br /> protection of wetlands resource areas . <br /> 3 . the Harbormaster and Shellfish Constable have <br /> approved the plans . <br /> 4 . the proposal will not be a detriment to the <br /> area and complies with the provisions of the <br /> by-laws . <br /> In view of the foregoing, the Mashpee Board of <br /> Appeals found that the applicant met the criteria necessary <br /> for the granting of a Special Permit. Upon motion duly <br /> made and seconded the Board of Appeals voted unanimously <br /> on December 14, 1994 to grant the Special Permit . The <br /> Permit is referenced by plans of Cape & Islands Engineering <br /> dated October 20 , 1994 . The Permit provides for the repair <br /> and maintenance of the structure in perpetuity . <br />
The URL can be used to link to this page
Your browser does not support the video tag.