Laserfiche WebLink
Minutes of Meeting of <br /> Mashpee Plan Review Committee <br /> Held Tuesday, January 4, 2022 <br /> Mashpee Town Hall Waquoit Meeting Room <br /> Catherine Laurent, DPW Director <br /> Catherine spoke to the Project Manager to confirm that the water runoff will be contained <br /> onsite. She asked if there will be a recycling container next to the dumpster. She wanted <br /> to know if a concrete curb will be installed or a Cape Cod Berm. She recommends that the <br /> Berm be installed. <br /> Glen Harrington, Health Agent <br /> Glen reviewed and approved the site and septic plans. He submitted his comments in a <br /> letter to the Engineer. The septic tank was changed to two compartments, and separated <br /> the individual vents on the trenches, and added the subsurface drainage put into the <br /> retention basin. Glen asked if there were floor drains in the store. Casey said there are no <br /> floor drains in the store. Glen asked if there will be paint recycling, and mentioned that the <br /> paint should be containerized. Casey said he will confirm if paint recycling will be done. <br /> Scott Carline, Police Chief <br /> His questions were addressed. <br /> Evan Lehrer, Town Planner <br /> He mentioned that he is very appreciative that Solli Engineering provided responses after <br /> reviewing the plans at the Planning Board public hearing. He mentioned the parking <br /> requirements to Attorney, Chris Kirrane, and noted the parking constraints abutting the <br /> residential district and Wampanoag Avenue. The Planning Department comments have <br /> been responded to, and had no further comments. <br /> Evan asked the status of the Mashpee Physical Therapy project. Dave said he inspected <br /> the building with the Fire Department. The business owner was issued a Certificate of <br /> Inspection. Chief Rullo said that the business owner is using temporary barriers that are <br /> actually better than installing individual rooms because the emergency lighting is visible to <br /> everyone. Evan said that if the owner wants to do any revisions to the site, he will need to <br /> talk with him. Chief Rullo said he was told to reach out to the Building Department and the <br /> Fire Department to work with him. <br /> Tom Rullo, Fire Chief <br /> Received comments from Solli Engineering regarding the vehicle access.Also, was given <br /> the list of the hazards and quantities. He asked that no gas vehicles be parked inside the <br /> access bay that is 6 ft. by 10 ft. He was very appreciative of the responses to all questions <br /> prior to the meeting. <br /> Chris Gallagher, Town Engineer <br /> The calculation plans were very well engineered and thorough. No issues. <br /> 2 <br />