My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/23/2022 ZONING BOARD OF APPEALS Minutes
>
03/23/2022 ZONING BOARD OF APPEALS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 2:48:04 PM
Creation date
4/14/2022 11:40:35 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BOARD OF APPEALS
Meeting Document Type
Minutes
Meeting Date
03/23/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MASHPEE ZONING BOARD OF APPEALS <br /> MEETING MINUTES <br /> MARCH 23, 2022 <br /> Mr.Bonvie made a motion that the Board issues a Variance for the front yard setback under <br /> §174-31 to Petitioner, Keith Gilmore, and the Owner, Daniel E. Phillips at 4 Blair Circle <br /> for said Variance.The current setback is 40 ft. from the front side,and the proposed setback <br /> is 25 ft.,and the relief request is 15 ft. to allow for an addition on property located in an R- <br /> 5 Zoning District, Map 3 Parcel 40, Mashpee, MA. (Owner of Record: Daniel E. Phillips). <br /> 1. The Board has determined that the applicant meets all the conditions of a Variance <br /> under Mass General Law 40A Section 10. <br /> 2. Site Plan —4 Blair Circle, Mashpee, MA. Prepared for: Daniel Phillips, Scale: 1" <br /> =30', Date: October 21, 2021, Revisions: 11/22/21: Reduced Addition, Prepared <br /> by: Demarest Land Surveying, Signed and stamped by: John Z. Demarest, Jr. No. <br /> 36859,Professional Land Surveyor, dated 11/22/21. <br /> 3. A Professional Engineer Land Surveyor to prepare a plan and submit said plan to <br /> the Building Inspector prior or at the same time as the application of the building <br /> permit that will depict the existing and proposed lot coverage that will meet the <br /> existing Zoning. <br /> 4. Plans: Prepared for Dan Phillips, 4 Blair Circle, Mashpee, MA. Date: 2/7/22, and <br /> revised 3/23/22. Said Revision is a 6 ft.opening as noted on Page 7 of the submitted <br /> plan outlined and signed by Keith C. Gilmore. This Plan also depicts the existing <br /> lot coverage as 4.15%, and the proposed is 6.71%. Prepared by: Keith C. Gilmore <br /> Enterprises LLC. Drawn by: Keith C. Gilmore, Scale: 1/4" = 1', Page 1: Proposed <br /> Addition: Front North Elevation, Page 2: Left East Elevation, Page 3: Rear South <br /> Elevation, Page 4: Right West Elevation, Page 5: North Elevation View, Page 6: <br /> Foundation Plan View, Page 7: First Floor Plan View, Page 8: Section Floor Plan <br /> View,Page 9:New Roof Frame Detail Plan View. <br /> 5. The Board issues a Variance in the amount of 15 ft. <br /> 6. Conditioned on all Town Department comments read into the record. <br /> 7. Conditioned that any changes to the plans will require the applicant to return to the <br /> Zoning Board of Appeals. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.