My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/18/1990 PLANNING BOARD Minutes
>
04/18/1990 PLANNING BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2022 5:05:05 PM
Creation date
6/22/2022 3:33:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING BOARD
Meeting Document Type
Minutes
Meeting Date
04/18/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Chris Burden stated that the abutter prefers not to see the <br /> road completed but to have it left as a driveway since it <br /> only serves one lot. <br /> Tony stated that they will have to make a request to waive <br /> road standards . As long as there are not safety issues <br /> involved doesn' t see a problem. <br /> Chris Burden stated that they have no problem labeling the <br /> remaining lot unbuildable. <br /> The Board would like to review the present road at an on <br /> site visit. <br /> Tom explained that they have a problem with zoning by law <br /> re:f ire access/fire protection requirement. It calls for 20 <br /> foot pavement and is something which cannot be waived. <br /> Common driveway cannot be considered frontage, has to be <br /> street. <br /> Tony stated that that has to do with determining whether or <br /> not you get a building permit. The building inspector will <br /> have to determine whether it is paved within 150 feet of the <br /> building. Eventually New Seabury will have to demonstrate <br /> that to the building inspector or can seek relief from the <br /> ZBA. <br /> Tom stated that they will need a waiver on the cul de sac <br /> turnaround. <br /> Tony suggested to the applicant they give a formal request <br /> in writing to the Board asking to waive the specific road <br /> standards . <br /> Board will need to see layout of driveway showing level of <br /> improvements they are planning to make and level of <br /> standards required to service the lot. <br /> There were no public questions or comments. <br /> There have been no comments yet from the Board of Health. <br /> The plan was filed on March S th. <br /> Louise made a motion to continue the public hearing to May <br /> grid at 6 : 45. Judy seconded the motion. All Board members <br /> were in favor. <br /> Applicant: Dolphin Bay/Ashers Heights. <br /> Request: Endorse plan and special permit. <br /> Rich Ferrera and an attorney from K. Kirrane 's office were <br /> present representing the applicant. <br /> The plan was approved on March 21 , 1990 . <br /> They filled out the covenant form and presented it to the <br /> Board. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.