My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2022 BOARD OF ASSESSORS Minutes
>
05/18/2022 BOARD OF ASSESSORS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 5:00:34 PM
Creation date
7/7/2022 1:22:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF ASSESSORS
Meeting Document Type
Minutes
Meeting Date
05/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX C—FY2024 <br /> Additional <br /> Asset Category Service Depreciation Reduction for <br /> Life Floor Economic <br /> Obsolescence <br /> AERIAL CABLE—FIBER installed before 2021 27.5 10% 35% <br /> ....._ - <br /> AERIAL CABLE—FIBER installed after 2020 27.5 10% 25% <br /> _ _ <br /> AERIAL CABLE—METALLIC 23 5% 35% <br /> ., ,_..... ... __ - ..... <br /> AERIAL CABLE-FTTP (DISTRIBUTION) <br /> Installed prior to 2022 27.5 20% 15% <br /> AERIAL CABLE—FTTP-(DISTRIBUTION) <br /> Installed in 2022 27.5 20% 0% <br /> _ - <br /> BURIED CABLE—FIBER installed before 2021 27.5 10% 35% <br /> __ ---- ............._ _ _. <br /> BURIED CABLE—FIBER installed after 2020 27.5 10% 25% <br /> BURIED CABLE—METALLIC 23 5% 35% <br /> BURIED CABLE-FTTP(DISTRIBUTION) <br /> Installed prior to 2022 27.5 20% 15% <br /> BURIED CABLE-FTTP(DISTRIBUTION) <br /> Installed in 2022 27.5 20% 0% <br /> - _ ... _ . ,,. . ... <br /> 5%flat rate to <br /> '81, 15%floor <br /> CONDUIT SYSTEMS 50 35% <br /> .. ._....... .. <br /> INTP BUILDING CABLE---FIBER <br /> installed before 2021 27.5 10% 35% <br /> INTRA BUILDING CABLE---FIBER installed <br /> after 2020 27.5 10% 25% <br /> _ _. .. ... .......... <br /> INTRA BUILDING CABLE-METALLIC _... 22.. 5% 35% <br /> INTRA BUILDING CABLE-FTTP <br /> (DISTRIBUTION) <br /> Installed prior to 2022 27.5 20% 15% <br /> INTRA BUILD11 ING CABLE-FTTP <br /> (DISTRIBUTION) <br /> Installed in 2022 27.5 20% 0% <br /> POLES 30tl 20% 35% <br /> _ - . ..... . <br /> SUBMARINE CABLE—FIBER installed before <br /> 2021 27.5 10% 35% <br /> ..... ........ <br /> SUBM <br /> ARINE CABLE—FIBER installed after <br /> 2020 27.5 10% 1 25% <br /> SUBMARINE CABLE--METALLIC 27.5 5% 35% <br /> SUBMARINE CABLE -FTTP (DISTRIBUTION) <br /> Installed prior to 2022 27.5 20% 15% <br /> SUBMARINE CABLE-FTTP (DISTRIBUTION) <br /> Installed in 2022 27.5 20% 0% <br /> UNDERGROUND CABLE—FIBER 27.5 10% 35% <br />
The URL can be used to link to this page
Your browser does not support the video tag.