My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/18/2022 BOARD OF ASSESSORS Minutes
>
05/18/2022 BOARD OF ASSESSORS Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2022 5:00:34 PM
Creation date
7/7/2022 1:22:10 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
BOARD OF ASSESSORS
Meeting Document Type
Minutes
Meeting Date
05/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX D--FY2025 <br /> Additional <br /> Asset Category Service Depreciation Reduction for <br /> Life Floor Economic <br /> Obsolescence <br /> AERIAL CABLE—FIBER installed before 2021 27.5 10% 35% <br /> AERIAL CABLE—FIBER installed after 2020 27.5 10% 25% <br /> . <br /> AERIAL CABLE—METALLIC 23..... 5% 35% <br /> AERIAL CABLE-FTTP (DISTRIBUTION) <br /> Installed prior to 2023 27.5 20% 14% <br /> AERIAL CABLE—FTTP-(DISTRIBUTION) <br /> Installed in 2023 27.5 20% 0% <br /> BURIED CABLE—FIBER installed before 2021 27.5 10% 35% <br /> BURIED CABLE—FIBER installed after 2020 27.5 10% 25% <br /> BURIED CABLE—METALLIC 23 5% 35% <br /> BURIED CABLE,.._FTT._.e. ......__.._ e wawa_._, _ .... <br /> P (DISTRIBUTION) <br /> Installed prior to 2023 27.5 20% 14% <br /> BURIED CABLE-FTTP (DISTRIBUTION) <br /> Installed in 2023 27.5 20% 0% <br /> 5% flat rate to <br /> `81, 15%floor <br /> CONDUIT SYSTEMS 50 post'81 35% <br /> . _. ... <br /> INTRA BUILDING CABLE—FIBER <br /> installed before 2021 27.5 10% 35% <br /> INTRA BUILDING CABLE—FIBER installed <br /> after 2020 27.5 10% 25% <br /> INTRA BUILDING CABLE-METALLIC 22.5 5% 35% <br /> INTRA BUILDING CABLE-FTTP <br /> (DISTRIBUTION) <br /> Installed prior to 2023 27.5 20% 14% <br /> INTRA BUII DING CABLE-FTTP <br /> (DISTRIBUTION) <br /> Installed in 2023 27.5 20% 0% <br /> POLES 30.... 20% 35% <br /> — ......... ,,, <br /> SUBMARINE CABLE—FIBER installed before <br /> 2021 27.5 10% 35% <br /> SUBMARINE CABLE—FIBER installed after <br /> 2020 27.5 10% 25% <br /> _ ... <br /> SUBMARINE CABLE—METALLIC 27.5 5% 35% <br /> SUBMARINE CABLE-FTTP (DISTRIBUTION) <br /> Installed prior to 2023 27.5 20% 14% <br /> ....... ,. <br /> SUBMARINE CABLE-FTTP (DISTR.IBUTION) <br /> Installed in 2023 27.5 20% 0% <br /> . .... <br /> UNDERGROUND CABLE—FIBER <br /> installed before 2021 27.5 10% 35% <br />
The URL can be used to link to this page
Your browser does not support the video tag.