My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/2022 SELECT BOARD Minutes
>
06/27/2022 SELECT BOARD Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 11:28:10 AM
Creation date
7/28/2022 10:14:40 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SELECT BOARD
Meeting Document Type
Minutes
Meeting Date
06/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5 <br /> Mashpee Select Board <br /> Minutes <br /> June 27,2022 <br /> APPOINTMENTS & HEARINGS <br /> Award of Contract formReptacement of Electric Partition at,Town Hatt: (continued) <br /> Motion made by Selectman Cotton to accept the recommendation of the DPW Director and award a <br /> contract to The Pappas Company in the amount of$62,700 for the Town Hall Partition to include Bid <br /> Alternate No. 1. <br /> Motion seconded by Selectman Sherman. <br /> VOTE: Unanimous. 5-0. <br /> Roll Call Vote: <br /> Selectman Gottlieb,yes Selectman Weeden,yes Selectman Cotton,yes <br /> Selectman O'Hara, yes Selectman Sherman,yes Opposed, none <br /> Update onWastewater Project: Ray Jack: <br /> The Select Board met with Ray Jack, engineer to discuss the status of Phase I associated to the Wastewater <br /> Plan. Appreciation was given to Mr. Jack for his expertise and for taking on this project and moving it forward <br /> for the Town of Mashpee. It was agreed the Wastewater Project would be a regular update on the Select <br /> Board's agenda. <br /> Mr. Jack gave a brief PowerPoint presentation on the project status. It was disclosed the mandatory pre- <br /> qualification process for the General Contractor and Sub-bidders is complete. All (3)contracts are currently <br /> being advertised in the Central Register. <br /> In the process the Sub-contractors bid opening occurs before the General Contractor bid opening. Sub- <br /> contractor bids are scheduled to be open on August 9, 2022. The General Contractor bid opening is scheduled <br /> on August 11, 2022. The contract execution for both bids is September 30,2022. <br /> The bidding includes; Water Resource Recovery Facility(WRRF)General Contractor and Sub-contractors <br /> under Contract#1 as referenced. <br /> Under Contract#2,the bid opening for Collection System North is August 4, 2022. Contract#3 Collection <br /> System South bid opening is August 11, 2022. The contract execution for these bids is also September 30, <br /> 2022. <br /> Mr. Jack gave a brief overview of the bid process under Phase I contracts. Within Contract#1 WRRF, a new <br /> Membrane Biological Reactor(MBR)facility would be constructed south of the Transfer Station. The Average <br /> Daily Flow(ADF)is 120k/GPD. The Maximum Daily Flow is 360K/Gallons Per Day. <br /> The Collection System North under Contract#2 is planned North of Route 28. Contract#3 Collection System <br /> South, south of Route 28 includes(3) lift stations to be located on Falmouth Road,Brewster Road and Mashpee <br /> Neck Road. <br /> The resource recovery process and its capacity as well as expansion and discharge were briefly reviewed. <br /> When the plant is online actual flows would be determined and assist with the data review. <br />
The URL can be used to link to this page
Your browser does not support the video tag.