My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2022 SEWER COMMISSION Minutes
>
10/13/2022 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2022 8:47:28 AM
Creation date
10/28/2022 8:43:22 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
10/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />MINUTES <br />MASHPEE BOARD OF SEWER COMMISSIONERS <br />THURSDAY OCTOBER 13, 2022, 2:00 p.m. <br />MASHPEE PUBLIC LIBRARY <br />EVENT ROOM <br />64 STEEPLE ST. <br />MASHPEE, MA 02649 <br />*In-person meeting* <br /> <br />Present: Chairman, Chad Smith, Vice-Chair, Meredith Harris, Recorder, Catherine Castaneda, <br /> Phyllis Sprout, Al Towle <br /> <br />Other attendees: Interim Town Engineer, Ray Jack <br /> Selectman, John Cotton <br /> <br />Absent: Joe Lyons <br /> <br />2:00PM – Convene Meeting Chairman, Chad Smith called the meeting to order at 2:00PM in <br />open session at Mashpee Public Library, Event Room. <br /> <br />PLEDGE OF ALLEGIANCE <br /> <br />MOMENT OF SILENCE <br /> <br />PUBLIC PARTICIPATION <br />N/A <br /> <br />MINUTES <br />Mr. Towle made a motion to accept the minutes of the September 22, 2022 Sewer <br />Commission meeting. <br />Meredith Harris seconded the motion. <br />The motion was passed by unanimous consent. <br /> <br />OLD BUSINESS <br />1. Updates to timetable and schedule of wastewater treatment. <br />Mr. Jack stated that the preconstruction meetings have been held and the contractors are <br />expected to break ground on the wastewater treatment plant and collection system in <br />November. <br />There are three contracts and two contracting companies involved in the project. <br />Contract 1 – The wastewater treatment facility contract was awarded to Waterline Industries <br />Corp. of Seabrook, NH. Mr. Jack stated that they are a very good Company and will serve the <br />Town well. <br />1 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.