Laserfiche WebLink
o Chop Chaque Bog: Reference site found for what the wetland restoration would <br /> look like...Triangle Pond in Sandwich turned out to be a good reference site. <br /> o Local Comprehensive Plan: Public scoping on natural resources completed <br /> • ADDITIONAL TOPICS: <br /> (This space is reserved for topics that the Chairman did not reasonably anticipate would <br /> be discussed). <br /> HEARINGS: <br /> 6:00 Warren Q.& Kim R.Fields, 25 Taffrail Way. Proposed repair to existing seawall. NOI <br /> Representative: Cape & Islands Engineering, Inc. Raul Lizardi presented the project <br /> details, including modification of existing ramp and float and invasive species removal <br /> (phragmites) in perpetuity. Harbor Master has signed off.Still awaiting shellfish constable <br /> comments.Agent reviewed photos of the site and said the project meets the applicable <br /> performance standards and anticipates a shellfish mitigation fee. Agent recommends <br /> close and issue pending condition of shellfish mitigation fee.Commissioner Zollo asked <br /> about the perpetuity request and ongoing monitoring reports. Agent clarified.Mr. Lizardi <br /> provided additional information regarding treatment of phragmites in perpetuity. Mr.Cook <br /> inquired about separation distance of subject float to float across the channel and any <br /> navigational concerns. Agent stated that Harbor Master has signed off but Chapter 91 will <br /> also have input. Mr.Colombo inquired about who will be doing the treatment of phragmites. <br /> Chairman asked for public comment and there was none. <br /> Mr. Weeden motioned to close and issue pending receipt of Shellfish Constable <br /> comments. Mr. Colombo seconded the motion. <br /> Vote: 6-0-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo: Yes <br /> Mrs. Zollo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.S m ith: Yes <br /> In favor:6; Against: 0; Abstentions: 0 <br /> 6:03 Frances Gloria Muir, Life Estate, 31 Wilsons Grove. Proposed septic system upgrade. NOI <br /> Representative: Shay Environmental Services. Carmen Shay represented the applicant <br /> and described the project. Septic system failure/upgrade project. Raised septic system <br /> proposed. Board of Health granted a 1 foot variance from groundwater. Agent reviewed <br /> photos of the site. Mr.Cook asked about the retaining wall and maintenance thereof. Mr. <br /> Shay provided clarification. <br /> Mr. Smith motioned for a close and issue. Mr. Dalton seconded the motion <br /> Vote: 5-1-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo: No <br /> Mrs. Zollo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:5;Against: 1;Abstentions: 0 <br /> 6:06 David M.&Ana S. Ferris, 36 Seconsett Point Road. Proposed expansion/modification NOI <br /> of pier, ramp and float. Representative: Cape& Islands Engineering, Inc. (Continued from <br /> 3/24 for further info/discussion, cost. from 4/14 for further discussion with Shellfish <br /> Constable, cont. from 4/28, 5/12 &5/26 for further discussion). Raul Lizardi presented the <br />