Laserfiche WebLink
the project. Dredging portion has been dropped and property owner agreed with revised <br /> modifications, including elimination of float size increase. Agent described Shellfish <br /> Constable concerns regarding invasive sponge. Shellfish mitigation fee recommended. <br /> Harbor Master signed off on proposed changes. Agent recommends Close and issue with <br /> condition of shellfish mitigation fee. No public comment <br /> Mr. Dalton motioned fora close and issue with condition of shellfish mitigation fee. Mr. <br /> Weeden seconded the motion <br /> Vote: 5-1-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo:Yes <br /> Mrs.Zollo: No <br /> Mr.Cook:Yes <br /> Mr.Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:5; Against: 1;Abstentions: 0 <br /> 6:09 Joshua T. Delman, 257 Monomoscoy Road. Proposed septic system upgrade, NOI <br /> relocation of sheds and mitigation plantings. Representative: Holmes& McGrath. Hearing <br /> to be continued to July 14th at 6:06 p.m. for receipt of a DEP number <br /> Mr. Dalton motioned for a continuance. Mr. Weeden seconded the motion <br /> Vote: 6-0-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo:Yes <br /> Mrs. Zollo: Yes <br /> Mr.Cook:Yes <br /> Mr.Dalton: Yes <br /> Mr. Smith: Yes <br /> In favor:6; Against: 0;Abstentions: 0 <br /> 6:12 Stephen & Kathryn Marshak, Mashpee Tree House, LLC,51 Timberlane Drive. NOI <br /> Proposed renovation and addition to existing dwelling. Representative: Falmouth <br /> Engineering, Inc. Mike Borselli of Falmouth Engineering represented the applicant and <br /> described the project. No increase in living space/septic flow. Number of bedrooms will <br /> remain the same. Board of Health does not recommend septic upgrade as area is slated to <br /> be sewered under phase 1. Mr. Borselli described areas that would be suitable for <br /> mitigation. Agent reviewed images of the project site and described the resource areas <br /> (inland bank leading to Santuit Pond). Agent recommended Close and Issue with condition <br /> of mitigation plantings. Mr.Colombo asked about the septic system and inspection <br /> thereof. Mr.Borselli responded that septic did not pass title V standards. Agent stated that <br /> most recent comment from Health Agent that an inspection is required. Additional <br /> discussion ensued. Commissioner Colombo recommended a continuance so that the <br /> applicant and Board of Health can be on the same page regarding the septic. Mr. Smith <br /> motioned for a continuance to July 141h @ 6:15 p.m. Mr. Borselli asked if there were <br /> any other issues with the project. No additional commentary. Mr. Weeden seconded <br /> the motion for a continuance <br /> Vote: 6-0-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo: Yes <br /> Mrs. Zollo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:6; Against: 0; Abstentions: 0 <br />