Laserfiche WebLink
due to the setbacks. No public comments. Agent recommends one year of mitigation <br /> monitoring and maintenance. Mr. Dalton motioned fora negative determination with <br /> condition of 1 year mitigation monitoring and maintenance signed contract. Mr. Cook <br /> seconded the motion <br /> Vote: 5-0-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:5; Against: 0; Abstentions: 0 <br /> 6:24 Southworth Mashpee Properties, LLC, 69 Shoestring Bay Road. Proposed AOC <br /> construction of new single family dwelling, garage, pool, patio, driveway,landscaping <br /> pathway to water and vista pruning. Representative: Baxter-Nye Engineering. Matthew <br /> Eddy presented the project details. Previous order issued for construction footprint and <br /> limit of work.Agent reviewed the resource areas and images of the site. Agent inquired <br /> about the area proposed for selective tree removal and plantings. Mr. Eddy explained <br /> reasoning behind selective clearing in this area. Agent recommends that the plan note that <br /> states "ornamental plantings" in that area should be removed and have a revised plan <br /> eliminating that note. Agent recommends approval of amended order request with <br /> conditions onsite meeting with consultant to assess thinning of pitch pines and a defined <br /> vista corridor. Commission Colombo asked about the proposed driveway and runoff <br /> concerns. Consultant said they could improve the runoff capture off the driveway. No public <br /> comment. Mr.Cook motioned forapproval of amended order with conditions of onsite <br /> meeting for pitch pine area and submission of revised plans for vista pruning. Mr. Dalton <br /> seconded the motion. <br /> Vote: 5-0-0 <br /> Mr.Weeden: Yes <br /> Mr. Colombo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:5; Against: 0; Abstentions: 0 <br /> 6:27 Popponesset Island Road, LLC,12 Popponesset Island Road. Proposed renovation of NOI <br /> existing boat house, deck and modifications to existing septic system. Representative: <br /> Holmes & McGrath, Inc. No DEP number issued yet. Commissioner Cook motioned for <br /> a continuance to July 14111 at 6:09 p.m. Mr.Colombo seconded the motion. <br /> Vote: 5-0-0 <br /> Mr.Weeden: Yes <br /> Mr.Colombo: Yes <br /> Mr.Cook: Yes <br /> Mr. Dalton: Yes <br /> Mr.Smith: Yes <br /> In favor:5; Against: 0; Abstentions: 0 <br /> 6:30 Eric Walker, 452 Nathan Ellis Highway. Proposed detached garage and modification to NOI <br /> existing driveway and mitigation plantings. Representative: Merrill Engineers & Land <br /> Surveyors. Mr. Merrill described the project and stated there was a last minute change <br /> involving driveway...no change to existing footprint. Mr. Merrill described the resource <br /> areas. New 1500 gallon septic tank, which can accommodate 4 bedrooms. Agent <br /> commented on DEP review requiring an alternatives analysis. Board of Health plans under <br /> review. Agent read building commissioner comments regarding septic system and <br /> proposed additional living unit. Conversation ensued regarding septic and bedroom count. <br /> Agent completed his comments. Commissioner Weeden asked for recommended <br />